TEXAS · WELLS · SHERMAN COUNTY · LOGAN A LEASE · API 42-421-30910 · DISTRICT 08

Logan A #5

Y

Sherman County · Palo Duro Creek (Red Cave) field · Producing  · Vertical

Logan A #5 (API 42-421-30910) is a well in Sherman County operated by Burk Royalty CO. Ltd., completed July 13, 2003 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2002 and 2003, permitted to 2,085 ft.

It was permitted by Conocophillips Company and has since transferred to Burk Royalty CO. Ltd. on the wellbore schedule.

Completion filings report one formation top, including Red Cave.

No lease production has been reported under this well’s leases.

Operator of record

Burk Royalty Co. Ltd.

Permitted by Conocophillips Company; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2025
Permits on file
384
Phone
(940) 397-8600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBurk Royalty Co. Ltd.
Production reportsScout Energy Management LLCthrough Apr 2026
Latest permitConocophillips CompanyJun 2, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,085
total depth, ft
2
permits on file
Jun 2, 2003
last permit issued
Jul 13, 2003
completed
0
cumulative oil, bbl
372K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 13, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Logan A G-14-188418Palo Duro Creek (Red Cave)Burk Royalty Co., Ltd.10372KApr 2002 – Jul 2026

Gas, mcf lease total

Last 12 months 3,023 · prior 12 3,087(-2%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyApr 2002 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Sep 2017
  3. 3Scout Energy Management LLCOct 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
532599-99RecompletionConocophillips CompanyJun 2, 2003Jun 2, 2003Jun 26, 20032,200
517828-99DrillPhillips Petroleum CompanyFeb 22, 2002Feb 25, 2002Mar 9, 20022,210

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 13, 2003Logan A G-14-188418Palo Duro Creek (Red Cave)Burk Royalty Co. Ltd.Producing2,085
Jul 13, 2003Logan A G-14-188418Palo Duro Creek (Red Cave)Burk Royalty Co. Ltd.Producing2,085

Formation tops

As filed on W-2/G-1. Subsea from 3,392 ft elevation.Download CSV →

FormationMD ftSubsea
Red Cave2,0201,372

Perforations

Perforated and open-hole intervals.

FromToType
2,0182,060Open hole
2,0182,085Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62550613.5330 S
72,0188.75200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 6, 2003Sep 12, 2003—
00Jun 18, 2002May 2, 2002Yes
00May 8, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42130910, documented in the API reference.