TEXAS · WELLS · SMITH COUNTY · GWF UNIT LEASE · API 42-423-30869 · DISTRICT 06

Moore M #1

Plugged

Smith County · Gresham (Travis Peak) field  · Vertical

Moore M #1 (API 42-423-30869) is a plugged well in Smith County, plugged May 27, 1995, last operated by Txo Production Corp..

The RRC has issued one drilling permit, issued August 10, 1984, permitted to 11,100 ft.

Completion filings report 6 formation tops, including Paluxy, Base Mass Anhyd., Base Mass. Anhyd., James Lime.

Its lease has reported 13.6K barrels of oil and 27K mcf of gas since January 1993, last reporting in August 2003. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

TXO Production Corp.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 2, 1990
Permits on file
3,227
Phone
(214) 954-2086

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsScheriger Productionthrough Dec 1994
Latest permitTXO Production Corp.Aug 10, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,100
total depth, ft
1
permits on file
Aug 10, 1984
last permit issued
Oct 23, 1984
completed
13.6K
cumulative oil, bbl
27K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 23, 1984
Shut in
—
Plugged
May 27, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
GWF Unit O-6-12505Gresham (Rodessa, Lower)Scheriger Production413.6K27KJan 1993 – Aug 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sikes Operating, Inc.Jan 1993 → Nov 1994
  2. 2Scheriger ProductionDec 1994 → Dec 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
248066-99DrillTXO Production Corp.Aug 30, 1984Aug 10, 1984Aug 28, 198411,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 23, 1984Moore M G-6-114674Gresham (Travis Peak)TXO Production Corp.Plugged—
Oct 20, 1984Moore M O-6-11511Gresham (Rodessa Lower)Sikes Producing Inc.Plugged—
Oct 20, 1984Moore M O-6-11511Gresham (Rodessa Lower)Sikes Producing Inc.Plugged—
Oct 20, 1984GWF Unit O-6-12505Gresham (Rodessa Lower)Scheriger ProductionPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 500 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy7,720-7,220
Base Mass Anhyd.9,460-8,960
Base Mass. Anhyd.9,460-8,960
James LimeJAMES9,913-9,413
James Lime9,913-9,413
Pettit10,165-9,665
Travis Peak10,358-9,858

Perforations

Perforated and open-hole intervals.

FromToType
9,6669,678Perforated
10,38610,398Perforated
10,43610,442Perforated
10,45010,455Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6256,305111,015 S
5.510,5257.875740 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 29, 1989Oct 24, 1984—
00Mar 24, 1989——
00Jun 7, 1986Oct 24, 1984—
00Feb 7, 1985Nov 16, 1984Yes
00Feb 6, 1985Nov 12, 1984—
00Nov 15, 1984Oct 24, 1984Yes
00Nov 9, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42330869, documented in the API reference.