TEXAS · WELLS · SMITH COUNTY · API 42-423-31360 · DISTRICT 06

Miller Jewel #1

Plugged

Smith County · Lost Fritz (Pettit) field  · Vertical

Miller Jewel #1 (API 42-423-31360) is a plugged well in Smith County, plugged October 16, 2000, last operated by J-W Operating CO..

The RRC has issued 2 drilling permits (amended once) between 1992 and 1993, permitted to 12,500 ft.

Completion filings report 2 formation tops, including Massive, Travis Peak.

Its 2 leases have reported 5.4K barrels of oil and 829K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

J-W Operating Co.

Based in
Addison, TX
P-5 status
Delinquent (D)
P-5 last filed
Jul 30, 2019
Permits on file
350
Phone
(972) 233-8191

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJ-W Operating Co.
Production reportsJ-W Operating Co.through Oct 2000
Latest permitJ-W Operating Co.Mar 4, 1993
12,500
total depth, ft
3
permits on file
Mar 4, 1993
last permit issued
Nov 1, 1993
completed
5.4K
cumulative oil, bbl
829K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 1, 1993
Shut in
—
Plugged
Oct 16, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Miller, Jewel G-6-144405Lost Fritz (Pettit)J-W Operating Co.15.04K774KFeb 1993 – Oct 2000
Miller, Jewel G-6-142352Lost Fritz (Travis Peak)J-W Operating Co.136555KJan 1993 – Jan 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1J-W Operating Co.Jan 1993 → Oct 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
409298-99RecompletionJ-W Operating Co.Feb 24, 1993Mar 4, 1993Feb 5, 199311,796
395518-98DrillC. W. Resources, Inc.Feb 6, 1992Jan 9, 1992Feb 22, 199212,500
395518-99DrillC. W. Resources, Inc.Dec 31, 1991Jan 9, 1992—12,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 1, 1993Miller Jewel G-6-144405Lost Fritz (Pettit)J-W Operating Co.Plugged—
Jun 25, 1992Miller Jewel G-6-142352Lost Fritz (Travis Peak)J-W Operating Co.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 437 ft elevation.Download CSV →

FormationMD ftSubsea
Massive10,370-9,933
Travis Peak11,225-10,788

Perforations

Perforated and open-hole intervals.

FromToType
11,07711,145Perforated
11,23511,620Perforated
11,23811,620Perforated
11,25011,538Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
20100—255 S
9.6255,74312.25605 S
5.511,7967.8752,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 18, 1994Nov 18, 1993—
00Mar 30, 1993Feb 23, 1993Yes
00Mar 25, 1993——
00Dec 28, 1992Nov 17, 1992—
00Oct 16, 1992Jul 30, 1992Yes
00Oct 6, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42331360, documented in the API reference.