TEXAS · WELLS · SMITH COUNTY · MAYNARD, A. LEASE · API 42-423-32002 · DISTRICT 06
Maynard A. #6H
Smith County · Chapel Hill (Cotton Valley) field · Producing · Horizontal
Maynard A. #6H (API 42-423-32002) is a horizontal well in Smith County operated by Valence Operating Company, completed April 17, 2006 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued August 29, 2005, permitted to 11,686 ft.
It was permitted by J-W Operating CO. and has since transferred to Valence Operating Company on the wellbore schedule.
Completion filings report 7 formation tops, including Paluxy, Massive Anhydrite (marker), Pettit, Travis Peak.
Its lease has reported 4.52K barrels of oil and 2.09M mcf of gas since March 2006, last reporting volume in April 2026.
Operator of record
Permitted by J-W Operating Co.; the EWA schedule now lists a different operator.
- Based in
- Kingwood, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2026
- Permits on file
- 990
- Phone
- (281) 359-3659
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Valence Operating Company |
| Production reports | Valence Operating Companythrough Apr 2026 |
| Latest permit | J-W Operating Co.Aug 29, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,686
- total depth, ft
- 1
- permits on file
- Aug 29, 2005
- last permit issued
- Apr 17, 2006
- completed
- 4.52K
- cumulative oil, bbl
- 2.09M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 17, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Maynard, A. G-6-220826 | Chapel Hill (Cotton Valley) | Valence Operating Company | 1 | 4.52K | 2.09M | Mar 2006 – Apr 2026 |
Gas, mcf lease total
Last 12 months 32,426 · prior 12 26,332(+23%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1J-W Operating Co.Mar 2006 → Sep 2013
- 2Valence Operating CompanyOct 2013 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 605578-99 | Drill | J-W Operating Co. | Aug 29, 2005 | Aug 29, 2005 | Jan 10, 2006 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 17, 2006 | Maynard A. G-6-220826 | Chapel Hill (Cotton Valley) | Valence Operating Company | Producing | 11,686 |
Formation tops
As filed on W-2/G-1. Subsea from 464 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Paluxy | 5,586 | -5,122 |
| Massive Anhydrite (marker)TOP MASSIVE ANHYDRITE | 7,220 | -6,756 |
| Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE | 7,487 | -7,023 |
| Pettit | 8,168 | -7,704 |
| Travis Peak | 8,301 | -7,837 |
| Taylor | 11,339 | -10,875 |
| MD Taylor | 11,427 | -10,963 |
| Bossier | 11,640 | -11,176 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,934 | 11,937 | Perforated |
| 12,380 | 12,383 | Perforated |
| 12,730 | 12,734 | Perforated |
| 13,120 | 13,124 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,250 | 11 | 640 S |
| 5.5 | 13,266 | 7.875 | 635 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 9, 2007 | Feb 8, 2007 | — |
| 00 | Mar 1, 2007 | May 24, 2006 | Yes |
| 00 | Nov 7, 2006 | — | — |
Well logs
4 logs loaded from the RRC's log index, the latest received Jul 5, 2007. Gamma ray, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| ResistivityRESISTIVITY GAMMA RAY CONDUCTIVITYSpans Travis Peak, Taylor, Md Taylor, Bossier | TIFF | 10,800 to 11,680 | Jul 5, 2007run Feb 18, 2006 | — |
| ResistivityRESISTIVITY GAMMA RAY CONDUCTIVITYSpans Travis Peak, Taylor, Md Taylor, Bossier | TIFF | 10,800 to 11,686 | Jul 5, 2007run Feb 18, 2006 | — |
| ResistivityRESISTIVITY GAMMA RAY CONUCTIVITYSpans Travis Peak, Taylor, Md Taylor, Bossier | TIFF | 10,800 to 13,260 | Jul 5, 2007run Feb 18, 2006 | — |
| ResistivityRESISTIVITY GAMMA RAY CONDUCTIVITYSpans Travis Peak, Taylor, Md Taylor, Bossier | TIFF | 10,800 to 13,250 | Jul 5, 2007run Feb 18, 2005 | — |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-32002 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-32002 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42332002, documented in the API reference.