WELL · 42-423-32045 · DISTRICT 6
Wilson Maxie #1
Smith County · Chapel Hill (Cotton Valley) field · Vertical
Wilson Maxie #1 (API 42-423-32045) is a plugged well in Smith County, plugged October 7, 2013, last operated by J-W Operating CO..
The RRC has issued one drilling permit, issued November 30, 2005, permitted to 13,000 ft.
Completion filings report 9 formation tops, including Woodbine, Massive Anhydrite (marker), Rodessa, Base Of Massive Anhydrate.
Operator of record
- Based in
- Addison, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jul 30, 2019
- Permits on file
- 350
- Phone
- (972) 233-8191
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J-W Operating Co. |
| Production reports | J-W Operating Co.through Aug 2013 |
| Latest permit | J-W Operating Co.Nov 30, 2005 |
- 13,000
- total depth, ft
- 1
- permits on file
- Nov 30, 2005
- last permit issued
- Jun 22, 2006
- completed
- 0
- cumulative oil, bbl
- 93.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2006 THROUGH Oct 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 22, 2006
- Shut in
- —
- Plugged
- Oct 7, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wilson, Maxie G-6-221897 | Chapel Hill (Cotton Valley) | J-W Operating Co. | 1 | 0 | 93.2K | Jun 2006 – Oct 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1J-W Operating Co.Jun 2006 → Aug 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 610255-99 | Drill | J-W Operating Co. | Nov 30, 2005 | Nov 30, 2005 | Jan 3, 2006 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-221897 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 515 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Woodbine | 4,019 | -3,504 |
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 6,885 | -6,370 |
| Rodessa | 7,080 | -6,565 |
| Base of Massive Anhydrate | 7,534 | -7,019 |
| Pettit | 7,675 | -7,160 |
| Travis Peak | 7,805 | -7,290 |
| Pettit | 8,250 | -7,735 |
| Travis Peak | 8,411 | -7,896 |
| Cotton Valley | 9,640 | -9,125 |
| Taylor | 10,770 | -10,255 |
| Taylor | 11,558 | -11,043 |
| Bossiel | 11,855 | -11,340 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,751 | 11,836 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,215 | 11 | 420 S |
| 5.5 | 12,000 | 7.875 | 708 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 8, 2007 | Feb 8, 2007 | — |
| 00 | Mar 15, 2007 | Jul 26, 2006 | Yes |
| 00 | Nov 21, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-32045 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-32045 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42332045, documented in the API reference.