WELL · 42-423-32225 · DISTRICT 6
South Tyler Paluxy Waterflood UT #4
Smith County · Tyler field · Vertical
South Tyler Paluxy Waterflood UT #4 (API 42-423-32225) is a permitted well in Smith County filed by Petrohawk Operating Company; no completion report is on file yet.
The RRC has issued one drilling permit, issued February 9, 2008, permitted to 7,900 ft.
Completion filings report one formation top, including Paluxy.
Its 2 leases have reported 428K barrels of oil since May 2007, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 2, 2017
- Permits on file
- 1,334
- Phone
- (713) 961-8500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petrohawk Operating Company |
| Production reports | Linder, John Operating Co., LLCthrough Apr 2026 |
| Latest permit | Petrohawk Operating CompanyFeb 9, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,900
- total depth, ft
- 1
- permits on file
- Feb 9, 2008
- last permit issued
- —
- completed
- 428K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| South Tyler Paluxy Unit O-6-14664 | Tyler | Linder, John Operating Co., LLC | 8 | 428K | 0 | May 2007 – Jul 2026 |
| South Tyler Paluxy Waterflood UT O-6-14810 | Tyler | Petrohawk Operating Company | 1 | 0 | 0 | Aug 2008 – Oct 2008 |
Oil, barrels lease total
Last 12 months 29,168 · prior 12 26,962(+8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Petrohawk Operating CompanyMay 2007 → Sep 2010
- 2Enervest Operating, L.L.C.Oct 2010 → Mar 2017
- 3Linder, John Operating Co., LLCApr 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 654464-99 | Drill | Petrohawk Operating Company | Feb 1, 2008 | Feb 9, 2008 | Mar 22, 2008 | 7,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-14664 | — | — | — | — |
| — | — O-6-14810 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 578 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Paluxy | 7,590 | -7,012 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,648 | 7,682 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,388 | 12.25 | 860 S |
| 5.5 | 7,900 | 8.75 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 13, 2009 | Aug 11, 2008 | Yes |
| 00 | Oct 2, 2008 | — | — |
| 00 | Sep 15, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-32225 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-32225 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42332225, documented in the API reference.