TEXAS · WELLS · SOMERVELL COUNTY · THELONIOUS MONK UNIT LEASE · API 42-425-30154 · DISTRICT 7C

Thelonious Monk Unit #3H

Shut in

Somervell County · Newark East (Barnett Shale) field · Temp Abandoned  · Horizontal

Thelonious Monk Unit #3H (API 42-425-30154) is a horizontal well in Somervell County operated by Eagleridge Operating LLC, completed June 5, 2007 and listed as temp abandoned on the RRC schedule, shut in February 1, 2020.

The RRC has issued one drilling permit, issued February 12, 2007, permitted to 5,433 ft.

It was permitted by Quicksilver Resources Inc. and has since transferred to Eagleridge Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Hood, Marble Falls, Barnett.

No lease production has been reported under this well’s leases.

Operator of record

Eagleridge Operating LLC

Permitted by Quicksilver Resources Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
129
Phone
(214) 295-6704

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEagleridge Operating LLC
Production reportsDiversified Production LLCthrough Sep 2022
Latest permitQuicksilver Resources Inc.Feb 12, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,433
total depth, ft
1
permits on file
Feb 12, 2007
last permit issued
Jun 5, 2007
completed
0
cumulative oil, bbl
794K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 5, 2007
Shut in
Feb 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thelonious Monk Unit G-13-237539Newark, East (Barnett Shale)Diversified Production LLC10794KJun 2007 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quicksilver Resources Inc.Jun 2007 → Jul 2015
  2. 2Barnett Shale Operating LLCFeb 2012 → Apr 2012
  3. 3Bluestone Natural Res. II, LLCJun 2016 → Dec 2019
  4. 4Blackbeard Operating, LLCJan 2020 → Jun 2021
  5. 5Diversified Production LLCJul 2021 → Sep 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
633188-99DrillQuicksilver Resources Inc.Feb 7, 2007Feb 12, 2007Feb 10, 20076,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 5, 2007Thelonious Monk Unit G-13-237539Newark East (Barnett Shale)Eagleridge Operating LLCTemp Abandoned · shut in Feb 1, 20205,433

Formation tops

As filed on W-2/G-1. Subsea from 637 ft elevation.Download CSV →

FormationMD ftSubsea
Hood4,773-4,136
Marble Falls4,922-4,285
BarnettBARNETT SHALE5,562-4,925

Perforations

Perforated and open-hole intervals.

FromToType
5,9328,381Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62550512.25215 S
5.58,4608.75730 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 10, 2008Feb 21, 2008Yes
00Aug 2, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42530154, documented in the API reference.