WELL · 42-427-03793 · DISTRICT 4
State Slick -C- #7
Starr County · Borosa S. (Vicksburg 2 Stray) field · Vertical
State Slick -C- #7 (API 42-427-03793) is a plugged well in Starr County, plugged October 16, 2004, last operated by Tenneco Oil CO..
The RRC has issued 3 drilling permits between 1978 and 1984, permitted to 5,916 ft.
Completion filings report 2 formation tops, including Frio, Vicksburg.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- May 30, 2007
- Permits on file
- 863
- Phone
- (713) 757-3525
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tenneco Oil Co. |
| Production reports | none |
| Latest permit | Tenneco Oil Co.Aug 13, 1984 |
- 5,916
- total depth, ft
- 3
- permits on file
- Aug 13, 1984
- last permit issued
- Sep 22, 1978
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 22, 1978
- Shut in
- —
- Plugged
- Oct 16, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Slick "C" G-4-116455 | Borosa, S.(frio 13) | Total E&P USA, Inc. | 1 | 0 | 0 | Jan 1993 – Oct 2004 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 248093-99 | Recompletion | Tenneco Oil Co. | Jan 25, 1985 | Aug 13, 1984 | — | 5,916 |
| 61219-99 | Recompletion | Tenneco Oil Co. | Oct 19, 1979 | Oct 19, 1979 | — | 5,916 |
| 26209-99 | Recompletion | Tenneco Oil Co. | Jun 12, 1978 | Jun 12, 1978 | — | 5,916 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-116455 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 391 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,254 | 2,260 | Perforated |
| 2,266 | 2,286 | Perforated |
| 2,288 | 2,298 | Perforated |
| 4,431 | 4,438 | Perforated |
| 4,622 | 4,628 | Perforated |
| 4,858 | 4,868 | Perforated |
| — | 4,901 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 830 | 15 | 450 S |
| 10.75 | 830 | — | 450 S |
| 2.375 | 4,490 | — | — |
| 2.375 | 4,722 | — | — |
| 7.625 | 5,916 | 9.875 | 400 S |
| 7.625 | 5,916 | — | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 11, 1986 | May 21, 1986 | — |
| 00 | Jul 30, 1985 | May 13, 1985 | — |
| 00 | Jun 11, 1985 | — | — |
| 00 | Jan 12, 1984 | Nov 20, 1979 | — |
| 00 | Jan 12, 1984 | Oct 16, 1978 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-03793 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-03793 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 140K
- bbl, all reported
- Nov 2004
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000059702 | W-14 Disposal | Plugged Dec 15, 2004 | 0 | 1,000 | 2,240–2,310 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42703793, documented in the API reference.