WELL · 42-427-04620 · DISTRICT 4
Slick, T. B. Est #51
Starr County · Vertical
Slick, T. B. Est #51 (API 42-427-04620) is a permitted well in Starr County filed by Fina Oil & Chemical Company; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1977 and 1997, permitted to 5,612 ft.
Completion filings report 3 formation tops, including Frio, Firo 18, Vicksburg.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- May 25, 2000
- Permits on file
- 1,328
- Phone
- (972) 801-2816
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Total E&P USA, Inc.through Aug 2005 |
| Latest permit | Fina Oil & Chemical CompanyJun 4, 1997 |
- 5,612
- total depth, ft
- 3
- permits on file
- Jun 4, 1997
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 137K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Slick, T. B. Est G-4-163808 | Hinde (Frio Stray) | OXY USA Inc. | 1 | 0 | 137K | Jun 1996 – Feb 2012 |
| Slick, T. B., Est. O-4-6235 | Hinde (Frio 16) | Shell Western E&P | 3 | 0 | 0 | Jan 1993 – Feb 2006 |
| Slick, T. B. Est. O-4-6243 | Hinde (Vksbg. No. 1, Lo.) | Totalfinaelf E&P USA Inc | 1 | 0 | 0 | Jan 1993 – Jan 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fina Oil & Chemical CompanyJul 1996 → Feb 1999
- 2Total E&P USA, Inc.Aug 2004 → Aug 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 462988-99 | Recompletion | Fina Oil & Chemical Company | May 28, 1997 | Jun 4, 1997 | Jun 25, 1996 | 5,612 |
| 13672-99 | Recompletion | Tenneco Oil Co. | Nov 24, 1977 | Nov 24, 1977 | — | 5,612 |
| 13671-99 | Recompletion | Tenneco Oil Co. | Nov 24, 1977 | Nov 24, 1977 | — | 5,612 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-163808 | — | — | — | — |
| — | — O-4-6235 | — | — | — | — |
| — | — O-4-6243 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 5,598 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,924 | 4,928 | Perforated |
| — | 5,108 | Perforated |
| — | 5,228 | Perforated |
| — | 5,424 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 260 | 12.25 | 160 S |
| 2.875 | 5,598 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 8, 1997 | Jun 2, 1997 | Yes |
| 00 | Aug 11, 1997 | — | — |
| 00 | Jan 12, 1984 | Dec 9, 1977 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-04620 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-04620 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42704620, documented in the API reference.