WELL · 42-427-05087 · DISTRICT 4

McGill Bros. #405

N

Starr County  · Vertical

Mcgill Bros. #405 (API 42-427-05087) is a permitted well in Starr County filed by Exxon Corp.; no completion report is on file yet.

The RRC has issued 8 drilling permits between 1977 and 1997, permitted to 8,470 ft.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsExxon Corp.through Jan 1999
Latest permitExxon Corp.Dec 5, 1997
8,470
total depth, ft
8
permits on file
Dec 5, 1997
last permit issued
—
completed
0
cumulative oil, bbl
289K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 23 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McGill Bros. O-4-9356WildcatOverton Park Oil & Gas LP2000Jan 1993 – Jul 2026
McGill Bros. G-4-157977Kelsey ( McGill 3 & 4)Exxon Mobil Corporation10276KApr 1996 – Dec 2010
McGill Bros. G-4-57080Kelsey ( K-1)Exxon Corp.100Jan 1993 – Jan 2000
McGill Bros. G-4-144478Kelsey (5000)Exxon Corp.1012.7KJan 1993 – Jan 2000
— G-4-112694——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Jan 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
470501-99RecompletionExxon Corp.Nov 24, 1997Dec 5, 1997—4,985
446075-99RecompletionExxon Corp.Mar 20, 1996Mar 20, 1996Apr 10, 19965,024
406255-99RecompletionExxon Corp.Nov 18, 1992Nov 18, 1992Nov 24, 19925,047
371508-99RecompletionExxon Corp.Mar 27, 1990Mar 28, 1990Mar 7, 19918,470
343921-99RecompletionExxon Corp.Mar 15, 1988Mar 17, 1988—8,470
299551-99RecompletionExxon Corp.Feb 25, 1986Mar 14, 1986—8,470
247130-99RecompletionExxon Corp.Aug 27, 1984Aug 1, 1984—8,470
1387-99OtherExxon Corp.Jun 22, 1977Jun 22, 1977—8,470

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-57080————
—— G-4-112694————
—— G-4-144478————
—— G-4-157977————
—— O-4-9356————

Perforations

Perforated and open-hole intervals.

FromToType
4,5474,552Perforated
4,6514,672Perforated
4,8174,833Perforated
4,9554,974Perforated
4,9894,997Perforated
5,1625,167Perforated
5,7495,766Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,55912.25400 S
9.6251,559—400 S
9.6251,56012.25400 S
2.8756,3108.75635 S
2.8756,3118.75635 S
2.8756,311—635 S
2.8756,3218.375635 sx
2.8756,3218.75—
2.8756,321——
2.8756,322——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 8, 2000Apr 10, 2000—
00Jun 11, 1996May 17, 1996Yes
00May 23, 1996—Yes
00Apr 28, 1993Feb 22, 1993Yes
00Mar 30, 1993——
00Jan 27, 1992Jul 15, 1991Yes
00Jan 16, 1992——
00Oct 4, 1984Sep 20, 1984—
00Oct 3, 1984Sep 20, 1984—
00Jan 12, 1984Jul 15, 1977—
00Jan 12, 1984Dec 21, 1973—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42705087, documented in the API reference.