TEXAS · WELLS · STARR COUNTY · API 42-427-30692 · DISTRICT 04
Gonzales E. G. Unit #19 #2
Starr County · Garcia (2775 Stray) field · Vertical
Gonzales E. G. Unit #19 #2 (API 42-427-30692) is a plugged well in Starr County, plugged July 15, 1988, last operated by Sun Exploration & Production CO..
The RRC has issued 3 drilling permits between 1984 and 1987, permitted to 3,760 ft.
It was permitted by Sun Expl. & Prod. CO.-Corpus and has since transferred to Sun Exploration & Production CO. on the wellbore schedule.
Completion filings report 2 formation tops, including 2775 Stray, Garcia.
Operator of record
Sun Exploration & Production Co.
Permitted by Sun Expl. & Prod. Co.-Corpus; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 23, 1988
- Permits on file
- 1,284
- Phone
- (214) 890-6205
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sun Exploration & Production Co. |
| Production reports | none |
| Latest permit | Sun Expl. & Prod. Co.-CorpusJul 29, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,760
- total depth, ft
- 3
- permits on file
- Jul 29, 1987
- last permit issued
- Mar 18, 1985
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 18, 1985
- Shut in
- —
- Plugged
- Jul 15, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 332221-99 | Recompletion | Sun Expl. & Prod. Co.-Corpus | Jun 29, 1987 | Jul 29, 1987 | — | 3,760 |
| 265899-99 | Recompletion | Sun Expl. & Prod. Co.-Corpus | Jan 28, 1985 | Feb 4, 1985 | — | 3,760 |
| 246888-99 | Recompletion | Sun Expl. & Prod. Co.-Corpus | Jul 31, 1984 | Jul 31, 1984 | — | 3,670 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 18, 1985 | Gonzales E. G. Unit #19 G-4-115801 | Garcia (2775 Stray) | Sun Exploration & Production Co. | Plugged | — |
| Sep 14, 1975 | Gonzales E. G. Unit #19 O-4-1020 | Garcia | Sun Expl. & Prod. Co.-Corpus | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 290 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 2775 Stray | 2,771 | -2,481 |
| Garcia | 3,465 | -3,175 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,771 | 2,777 | Perforated |
| — | 3,691 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 303 | 12.25 | 110 S |
| 4.5 | 3,758 | 7.875 | 260 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 5, 1985 | Oct 11, 1985 | — |
| 00 | Apr 23, 1985 | Apr 8, 1985 | — |
| 00 | Apr 19, 1985 | — | — |
| 00 | Jan 12, 1984 | Sep 25, 1975 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-30692 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-30692 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42730692, documented in the API reference.