TEXAS · WELLS · STARR COUNTY · API 42-427-31328 · DISTRICT 04

Montalvo I. V. -C- #39

Plugged

Starr County · Sun North (5470) field  · Vertical

Montalvo I. V. -C- #39 (API 42-427-31328) is a plugged well in Starr County, plugged February 23, 1990, last operated by Oryx Energy Company.

The RRC has issued 5 drilling permits between 1979 and 1988, permitted to 9,300 ft.

It was permitted by Sun Exploration & Production CO. and has since transferred to Oryx Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Vicksburg, Rincon, Rincon Ii.

Operator of record

Oryx Energy Company

Permitted by Sun Exploration & Production Co.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 27, 1998
Permits on file
1,627
Phone
(972) 715-4000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSun Exploration & Production Co.Nov 18, 1988
9,300
total depth, ft
5
permits on file
Nov 18, 1988
last permit issued
Nov 20, 1986
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 20, 1986
Shut in
—
Plugged
Feb 23, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
353457-99RecompletionSun Exploration & Production Co.Nov 18, 1988Nov 18, 1988—8,862
247010-99RecompletionSun Expl. & Prod. Co.-CorpusJul 31, 1984Aug 1, 1984—8,862
241504-99RecompletionSun Expl. & Prod. Co.-CorpusJun 8, 1984Jun 8, 1984—8,862
226544-99RecompletionSun Expl. & Prod. Co.-CorpusJan 11, 1984Jan 12, 1984—8,862
51438-99DrillSun Expl. & Prod. Co.-CorpusJun 21, 1979Jun 21, 1979Jul 6, 19799,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 20, 1986Montalvo I. V. -C- O-4-11148Sun North (5470)Oryx Energy CompanyPlugged—
Aug 10, 1984Montalvo I.V. -C- G-4-112296Sun North (5470)Sun Expl. & Prod. Co.-CorpusPlugged—
Jun 20, 1984Montalvo I.V. C O-4-10534Sun North (Vicksburg 5980)Sun Expl. & Prod. Co.-CorpusPlugged—
Feb 5, 1984Montalvo I.V. C G-4-109160Sun North (Rincon II)Sun Expl. & Prod. Co.-CorpusPlugged—
Sep 27, 1979Montalvo I.V. C G-4-85171Sun North (Rincon)Sun Expl. & Prod. Co.-CorpusPlugged—
Aug 14, 1979Montalvo I.V. C G-4-84865Sun North (Vicksburg 7140)Sun Expl. & Prod. Co.-CorpusPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 323 ft elevation.Download CSV →

FormationMD ftSubsea
Vicksburg5,980-5,657
VicksburgVICKSBURG 59805,980-5,657
Rincon6,539-6,216
Rincon II6,602-6,279
VicksburgVICKSBURG 71407,141-6,818

Perforations

Perforated and open-hole intervals.

FromToType
5,4665,473Perforated
5,9805,984Perforated
6,5396,554Perforated
6,6026,607Perforated
7,1407,179Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,01314.75990 S
2.3756,457——
2.3756,994——
77,8039.8751,277 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 5, 1987Dec 5, 1986—
00Dec 20, 1986——
00Sep 14, 1984Aug 24, 1984—
00Sep 13, 1984Aug 24, 1984—
00Jul 30, 1984Jun 29, 1984—
00Jul 24, 1984Jun 29, 1984—
00Mar 27, 1984Feb 15, 1984—
00Mar 10, 1984Feb 15, 1984—
00Jan 12, 1984Oct 31, 1979—
00Jan 12, 1984Oct 12, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42731328, documented in the API reference.