TEXAS · WELLS · STARR COUNTY · API 42-427-31494 · DISTRICT 04

McGill Bros #473

Plugged

Starr County · Kelsey South (Zone 17-B III) field  · Vertical

Mcgill Bros #473 (API 42-427-31494) is a plugged well in Starr County, plugged June 7, 1996, last operated by Exxon Corp..

The RRC has issued 6 drilling permits (amended once) between 1981 and 1996, permitted to 8,400 ft.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsnone
Latest permitExxon Corp.Jan 5, 1996
8,400
total depth, ft
7
permits on file
Jan 5, 1996
last permit issued
Mar 4, 1996
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 4, 1996
Shut in
—
Plugged
Jun 7, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 25 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McGill Bros. O-4-9356WildcatOverton Park Oil & Gas LP2000Jan 1993 – Jul 2026
McGill Bros G-4-157609Kelsey, South (Zone 17-B, III)Exxon Corp.100Mar 1996 – Jun 1996
McGill Bros. O-4-7457Kelsey, South (Zone 20-a, SE)Exxon Corp.400Jan 1993 – Oct 1995

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
443447-98RecompletionExxon Corp.Feb 22, 1996Jan 5, 1996Jan 26, 19965,876
443447-99RecompletionExxon Corp.Jan 5, 1996Jan 5, 1996—5,876
416372-99RecompletionExxon Corp.Sep 23, 1993Sep 23, 1993Oct 24, 19936,265
205630-99RecompletionExxon Corp.Aug 9, 1983Aug 15, 1983—8,000
169924-99RecompletionExxon Corp.Aug 23, 1982Aug 23, 1982—8,400
146054-99RecompletionExxon Corp.Dec 30, 1981Dec 30, 1981—8,400
105146-99DrillExxon Corp.Jan 14, 1981Jan 14, 1981Jan 31, 19818,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 4, 1996McGill Bros G-4-157609Kelsey South (Zone 17-B III)Exxon Corp.Plugged—
Oct 31, 1993McGill Bros. O-4-9356WildcatHilcorp Energy CompanyPlugged—
May 14, 1984McGill Bros. O-4-7457Kelsey South (Zone 20-a SE)Exxon Corp.Plugged—
May 14, 1984McGill Bros. O-4-7457Kelsey South (Zone 20-a SE)Exxon Corp.Plugged—
May 14, 1984McGill Bros. O-4-7457Kelsey South (Zone 20-a SE)Exxon Corp.Plugged—
Mar 17, 1981McGill Brothers G-4-94618Kelsey South (Zone 24-A&b E)Exxon Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,5605,567Perforated
5,8455,852Perforated
5,9025,905Perforated
6,0366,040Perforated
6,1946,200Perforated
7,1047,112Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,53512.25580 S
8.6251,53612.25580 S
2.8757,9937.875869 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 11, 1996Apr 10, 1996Yes
00Apr 15, 1996——
00Jan 21, 1994Nov 15, 1993Yes
00Nov 23, 1993Jan 14, 1985—
00Feb 11, 1985Jan 14, 1985—
00Sep 25, 1984Jul 25, 1984—
00Jan 12, 1984Jul 25, 1984—
00Jan 12, 1984Jun 16, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.