TEXAS · WELLS · STARR COUNTY · API 42-427-31759 · DISTRICT 04

Rodriguez S. #7

Plugged

Starr County · Sun N. (D-X-G Seg. C) field  · Vertical

Fields on the latest permit · any of 4
Sun, North (D-2-D) · Field 87124215 · Sun, North (D-3-D) · Sun, North (DX-G)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Rodriguez S. #7 (API 42-427-31759) is a plugged well in Starr County, plugged September 1, 1989, last operated by Oryx Energy Company.

The RRC has issued 3 drilling permits (amended once) between 1983 and 1986, permitted to 8,000 ft.

It was permitted by Sun Expl. & Prod. CO.-Corpus and has since transferred to Oryx Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Garza, C-3, F-2-10, 7600 Vicksburg.

Operator of record

Oryx Energy Company

Permitted by Sun Expl. & Prod. Co.-Corpus; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 27, 1998
Permits on file
1,627
Phone
(972) 715-4000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOryx Energy Company
Production reportsnone
Latest permitSun Expl. & Prod. Co.-CorpusMay 13, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
4
permits on file
May 13, 1986
last permit issued
Dec 13, 1986
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 13, 1986
Shut in
—
Plugged
Sep 1, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
302064-98RecompletionSun Expl. & Prod. Co.-CorpusNov 20, 1986May 13, 1986—7,700
302064-99RecompletionSun Expl. & Prod. Co.-CorpusMay 12, 1986May 13, 1986—7,700
234757-99RecompletionSun Expl. & Prod. Co.-CorpusApr 5, 1984Apr 6, 1984—7,700
194229-99DrillSun Expl. & Prod. Co.-CorpusMay 10, 1983May 10, 1983May 31, 19838,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 13, 1986Rodriguez S. G-4-122935Sun N. (D-X-G Seg. C)Oryx Energy CompanyPlugged—
May 7, 1984Rodriguez S. G-4-110706Sun North (F-2-10)Sun Expl. & Prod. Co.-CorpusPlugged—
Jul 15, 1983Rodriguez S. O-4-10306Sun North (7600 Vicksburg)Sun Expl. & Prod. Co.-CorpusPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 285 ft elevation.Download CSV →

FormationMD ftSubsea
Garza4,747-4,462
C-34,993-4,708
F-2-105,660-5,375
7600 Vicksburg7,620-7,335

Perforations

Perforated and open-hole intervals.

FromToType
5,3025,307Perforated
5,6605,676Perforated
7,5807,620Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,53312.5450 S
9.6251,53312.25450 sx
2.8757,504——
77,6968.751,272 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 20, 1987Dec 22, 1986Yes
00Jan 9, 1987—Yes
00Jun 18, 1984May 16, 1984—
00Jun 6, 1984May 16, 1984—
00Jan 12, 1984Jul 29, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42731759, documented in the API reference.