TEXAS · WELLS · STARR COUNTY · API 42-427-32213 · DISTRICT 04
Slick Est. -C- #9
Starr County · Borosa E. (7540 Vicksburg) field · Vertical
Slick Est. -C- #9 (API 42-427-32213) is a plugged well in Starr County, plugged December 27, 1995, last operated by Oryx Energy Company.
The RRC has issued 3 drilling permits between 1987 and 1990, permitted to 9,050 ft.
Completion filings report 2 formation tops, including 7540 Vicksburg, 7830 Vicksburg.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 27, 1998
- Permits on file
- 1,627
- Phone
- (972) 715-4000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Oryx Energy Company |
| Production reports | none |
| Latest permit | Oryx Energy CompanyDec 31, 1990 |
- 9,050
- total depth, ft
- 3
- permits on file
- Dec 31, 1990
- last permit issued
- Feb 21, 1991
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 21, 1991
- Shut in
- —
- Plugged
- Dec 27, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Slick Est. -C- G-4-137298 | Borosa, E. (7540 Vicksburg) | Oryx Energy Company | 1 | 0 | 0 | Jan 1993 – Dec 1995 |
| — G-4-126747 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 382811-99 | Recompletion | Oryx Energy Company | Dec 31, 1990 | Dec 31, 1990 | Jan 7, 1991 | 8,750 |
| 353050-99 | Recompletion | Sun Exploration & Production Co. | Nov 7, 1988 | Nov 9, 1988 | — | 8,750 |
| 335256-99 | Drill | Sun Expl. & Prod. Co.-Corpus | Aug 28, 1987 | Aug 28, 1987 | — | 9,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 21, 1991 | Slick Est. -C- G-4-137298 | Borosa E. (7540 Vicksburg) | Oryx Energy Company | Plugged | — |
| Nov 5, 1987 | Slick Est -C- G-4-126747 | Borosa E. (7830 Vicksburg) | Oryx Energy Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 379 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 7540 Vicksburg | 7,544 | -7,165 |
| 7830 Vicksburg | 7,834 | -7,455 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,544 | 7,548 | Perforated |
| 7,563 | 7,570 | Perforated |
| 7,574 | 7,599 | Perforated |
| 7,603 | 7,616 | Perforated |
| 7,834 | 7,846 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,515 | 14.75 | 855 S |
| 7.625 | 7,140 | 9.875 | 410 S |
| 5 | 8,670 | 6.75 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 4, 1991 | Mar 4, 1991 | — |
| 00 | Apr 11, 1991 | Feb 11, 1991 | Yes |
| 00 | Mar 22, 1991 | — | Yes |
| 00 | Apr 25, 1988 | Nov 16, 1987 | Yes |
| 00 | Apr 1, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-32213 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-32213 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42732213, documented in the API reference.