TEXAS · WELLS · STARR COUNTY · API 42-427-32289 · DISTRICT 04

Cameron State Unit #1

Plugged

Starr County · Cameron South (Faye 6500) field  · Vertical

Fields on the latest permit · any of 10
Cameron South (Faye 6500) · Rincon, North (F-30) · Field 76723146 · Field 76723204 · Rincon, N. (G-76) · Rincon N. (G-81) · Field 76723224 · Rincon N. (G-84) · Rincon N. (H-46) · Field 76725333
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Cameron State Unit #1 (API 42-427-32289) is a plugged well in Starr County, plugged September 10, 1988, last operated by Mueller Engineering Corp..

The RRC has issued one drilling permit, issued August 30, 1988, permitted to 7,400 ft.

It was permitted by Mueller Engineering Corp. and has since transferred to Mueller Engineering Corp. on the wellbore schedule.

Operator of record

Mueller Engineering Corp.

Permitted by Mueller Engineering Corp.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMueller Engineering Corp.Aug 30, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,400
total depth, ft
1
permits on file
Aug 30, 1988
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 10, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
350425-99DrillMueller Engineering Corp.Aug 23, 1988Aug 30, 1988—7,400

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42732289, documented in the API reference.