WELL · 42-427-32314 · DISTRICT 4

Parks / Hickman #1

N

Starr County · Arroyo Los Olmos (Yegua 25) field  · Vertical

Parks / Hickman #1 (API 42-427-32314) is a well in Starr County operated by Mortimer Exploration Company, completed January 30, 1989.

The RRC has issued one drilling permit, issued December 1, 1988, permitted to 6,000 ft.

Completion filings report 2 formation tops, including Frio, Yegua.

Its 2 leases have reported 20.2K barrels of oil and 109K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Mortimer Exploration Company

Based in
San Antonio, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 26, 2003
Permits on file
108
Phone
(210) 821-6168

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMortimer Exploration Company
Production reportsMortimer Production Companythrough Apr 2026
Latest permitMortimer Exploration CompanyDec 1, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
1
permits on file
Dec 1, 1988
last permit issued
Jan 30, 1989
completed
20.2K
cumulative oil, bbl
109K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 30, 1989
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parks/Hickman O-4-12017Arroyo Los Olmos (Yegua 25)Mortimer Production Company120.2K109KJan 1993 – Jul 2026
— G-4-130059——000—

Gas, mcf lease total

Last 12 months 95 · prior 12 1,819(-95%)

0100200300202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 6(-100%)

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mortimer Exploration CompanyJan 1993 → Sep 2003
  2. 2Mortimer Production CompanyOct 2003 → Nov 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
353820-99DrillMortimer Exploration CompanyDec 1, 1988Dec 1, 1988—6,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-130059————
—— O-4-12017————

Formation tops

As filed on W-2/G-1. Subsea from 265 ft elevation.Download CSV →

FormationMD ftSubsea
Frio800-535
Yegua3,630-3,365

Perforations

Perforated and open-hole intervals.

FromToType
4,9705,449Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62550512.25280 S
74,4048.75325 S
4.56,0126.125275 S
4.56,0226.125275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 17, 1992Feb 7, 1992—
00Feb 28, 1992——
00Apr 21, 1989Feb 24, 1989Yes
00Mar 18, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42732314, documented in the API reference.