WELL · 42-427-32385 · DISTRICT 4

T. B. Slick Estate 'H' #85

N

Starr County  · Vertical

T. B. Slick Estate 'H' #85 (API 42-427-32385) is a permitted well in Starr County filed by Hilcorp Energy Company; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1990 and 2014, permitted to 6,100 ft.

Completion filings report 4 formation tops, including Frio, L - 1, L-1, Vicksburg.

Its 3 leases have reported 271K barrels of oil and 1.28M mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Feb 2021
Latest permitHilcorp Energy CompanyMar 25, 2014
6,100
total depth, ft
3
permits on file
Mar 25, 2014
last permit issued
—
completed
271K
cumulative oil, bbl
1.28M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Slick T.B. "H" G-4-134053Rincon (Vicksburg Cons.)Hilcorp Energy Company100Jan 1993 – Jul 2026
Slick, T. B. Estate -H- O-4-2380Rincon (Vicksburg Sand)Hilcorp Energy Company3271K1.28MJan 1993 – Jul 2026
— G-4-137316——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Feb 1993 → Dec 2002
  2. 2Conocophillips CompanyFeb 2003 → Aug 2003
  3. 3Kerr-McGee Oil & Gas Onshore LLCSep 2003 → Nov 2005
  4. 4Houston Exploration Company, TheDec 2005 → Jun 2007
  5. 5Forest Oil CorporationJul 2007 → Dec 2012
  6. 6Hilcorp Energy CompanyJan 2013 → Feb 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
780649-99RecompletionHilcorp Energy CompanyFeb 25, 2014Mar 25, 2014—5,766
381428-99RecompletionConoco Inc.Nov 21, 1990Dec 11, 1990Oct 31, 19906,100
369649-99DrillConoco Inc.Feb 8, 1990Feb 8, 1990—6,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-134053————
—— G-4-137316————
—— O-4-2380————

Formation tops

As filed on W-2/G-1. Subsea from 406 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO H4,120-3,714
FrioFRIO K4,420-4,014
L - 14,480-4,074
L-14,480-4,074
VicksburgVICKSBURG 15,400-4,994
VicksburgVICKSBURG I5,400-4,994

Perforations

Perforated and open-hole intervals.

FromToType
5,4475,470Perforated
5,4705,494Perforated
5,5005,509Perforated
5,5605,590Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62555512.25240 S
5.55,7587.875915 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 13, 1992Aug 31, 1992—
00Sep 11, 1992——
00Apr 25, 1991Nov 21, 1990Yes
00Mar 25, 1991——
00May 30, 1990Mar 29, 1990Yes
00Apr 28, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42732385, documented in the API reference.