WELL · 42-427-32392 · DISTRICT 4
Bass, Velma #1
Starr County · Vertical
Bass, Velma #1 (API 42-427-32392) is a permitted well in Starr County filed by Wagner, Duer & CO.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1990 and 1996, permitted to 2,000 ft.
Completion filings report 2 formation tops, including Frio, Jackson.
Its 2 leases have reported 3.43K barrels of oil and 85.8K mcf of gas since January 1993, last reporting in May 2016. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 25, 1998
- Permits on file
- 162
- Phone
- (817) 335-2222
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | White Oak Operating Company LLCthrough Mar 2004 |
| Latest permit | Wagner, Duer & Co.Mar 27, 1996 |
- 2,000
- total depth, ft
- 3
- permits on file
- Mar 27, 1996
- last permit issued
- —
- completed
- 3.43K
- cumulative oil, bbl
- 85.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bass, Velma G-4-158198 | Gregg Wood (1400) | Trek Resources, Inc. | 1 | 0 | 83.1K | Oct 1995 – May 2016 |
| Bass, Velma O-4-11811 | Gregg Wood (1400) | Wagner, Duer & Co. | 1 | 3.43K | 2.68K | Jan 1993 – Apr 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wagner, Duer & Co.Jan 1993 → Dec 1998
- 2Wagner Oil CompanyJan 1999 → Nov 2002
- 3White Oak Operating Company LLCDec 2002 → Mar 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 442007-99 | Recompletion | Wagner, Duer & Co. | Nov 15, 1995 | Mar 27, 1996 | Oct 1, 1995 | 1,550 |
| 405732-99 | Other | Wagner, Duer & Co. | Nov 5, 1992 | Nov 5, 1992 | — | 2,000 |
| 370417-99 | Drill | Wagner, Duer & Co. | Mar 1, 1990 | Mar 5, 1990 | — | 1,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-158198 | — | — | — | — |
| — | — O-4-11811 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 169 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,259 | 1,263 | Perforated |
| 1,450 | 1,457 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,548 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 20, 1996 | Apr 23, 1996 | Yes |
| 00 | May 31, 1996 | — | — |
| 00 | Oct 8, 1990 | Aug 24, 1990 | Yes |
| 00 | Sep 19, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-32392 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-32392 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42732392, documented in the API reference.