TEXAS · WELLS · STARR COUNTY · GARCIA L&L CO. LEASE · API 42-427-32561 · DISTRICT 04

Garcia L&L Co. #9

Shut in

Starr County · Frost (Rincon 2A Seg. II) field · Temp Abandoned  · Vertical

Garcia L&L CO. #9 (API 42-427-32561) is a well in Starr County operated by Mountain V Texas LLC, completed March 3, 2013 and listed as temp abandoned on the RRC schedule, shut in January 1, 1998.

The RRC has issued one drilling permit, issued March 11, 1993, permitted to 5,894 ft.

It was permitted by Oryx Energy Company and has since transferred to Mountain V Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Frio, T/Vicksburg, Vicksburg, Rincon.

Its lease has reported 5.1K barrels of oil and 658K mcf of gas since April 1993, with no volume in the three years through April 2026.

Operator of record

Mountain V Texas LLC

Permitted by Oryx Energy Company; the EWA schedule now lists a different operator.

Based in
Buckhannon, WV
P-5 status
Active (A)
P-5 last filed
Sep 11, 2025
Phone
(304) 842-6320

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMountain V Texas LLC
Production reportsMountain V Texas, LLCthrough Oct 1996
Latest permitOryx Energy CompanyMar 11, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,894
total depth, ft
1
permits on file
Mar 11, 1993
last permit issued
Mar 3, 2013
completed
5.1K
cumulative oil, bbl
658K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Oct 1996

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 3, 2013
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garcia L&L Co. G-4-145014Frost (Rincon 2A, Seg. II)Mountain V Texas, LLC15.1K658KApr 1993 – Oct 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oryx Energy CompanyApr 1993 → Oct 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
409760-99DrillOryx Energy CompanyMar 11, 1993Mar 11, 1993Mar 20, 19937,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 3, 2013Garcia L&L Co. G-4-145014Frost (Rincon 2A Seg. II)Mountain V Texas LLCTemp Abandoned · shut in Jan 1, 19985,894

Formation tops

As filed on W-2/G-1. Subsea from 390 ft elevation.Download CSV →

FormationMD ftSubsea
Frio3,560-3,170
T/Vicksburg4,480-4,090
Vicksburg4,480-4,090
Rincon4,495-4,105
Rinconq4,495-4,105
2ND Rincon5,700-5,310

Perforations

Perforated and open-hole intervals.

FromToType
4,1924,204Perforated
4,6044,610Perforated
5,7135,736Perforated
5,7465,754Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,50912.25415 S
5.55,8538.751,320 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 26, 2013Apr 12, 2013—
00May 18, 1993Apr 29, 1993Yes
00May 7, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42732561, documented in the API reference.