WELL · 42-427-32999 · DISTRICT 4

Southwest Farm & Ranch-State #7

N

Starr County · Borosa N.W. (Vicksburg 9250) field  · Vertical

Southwest Farm & Ranch-State #7 (API 42-427-32999) is a well in Starr County operated by Totalfinaelf E&P USA Inc, completed July 14, 1997.

The RRC has issued 2 drilling permits between 1997 and 2001, permitted to 10,200 ft.

Completion filings report 4 formation tops, including T-4, T-5, T-6, T-8.

No lease production has been reported under this well’s leases.

Operator of record

Totalfinaelf E&P USA Inc

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 18, 2002
Permits on file
138
Phone
(713) 647-3559

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTotalfinaelf E&P USA Inc
Production reportsMerit Energy Companythrough Apr 2026
Latest permitTotalfinaelf E&P USA IncApr 20, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,200
total depth, ft
2
permits on file
Apr 20, 2001
last permit issued
Jul 14, 1997
completed
0
cumulative oil, bbl
810K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 14, 1997
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Southwest Farm & Ranch-State G-4-185094Hinde (Vicksburg Consolidated)Merit Energy Company10311KFeb 2001 – Jul 2026
Southwest Farm & Ranch-State G-4-164978Borosa, N.W. (Vicksburg 9250)Totalfinaelf E&P USA Inc10499KJul 1997 – Feb 2001

Gas, mcf lease total

Last 12 months 283 · prior 12 96(+195%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJul 1997 → Dec 2000
  2. 2Totalfinaelf E&P USA IncJan 2001 → Aug 2003
  3. 3Total E&P USA, Inc.Sep 2003 → Jan 2006
  4. 4Shell Western E&PFeb 2006 → Apr 2011
  5. 5OXY USA Inc.May 2011 → Apr 2017
  6. 6Merit Energy CompanyMay 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
508048-99RecompletionTotalfinaelf E&P USA IncApr 20, 2001Apr 20, 2001Feb 10, 200110,200
462977-99DrillFina Oil & Chemical CompanyMay 28, 1997May 29, 1997Jun 7, 199710,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-164978————
—— G-4-185094————

Formation tops

As filed on W-2/G-1. Subsea from 394 ft elevation.Download CSV →

FormationMD ftSubsea
T-46,825-6,431
T-57,283-6,889
T-57,330-6,936
T-67,560-7,166
T-88,385-7,991
T-88,672-8,278

Perforations

Perforated and open-hole intervals.

FromToType
7,2837,298Perforated
8,6728,700Perforated
8,7068,726Perforated
8,7368,745Perforated
8,7648,784Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,52014.75966 S
7.6257,0289.375910 S
7.6257,0289.875910 S
3.59,9316.75540 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 7, 2001Oct 11, 2001Yes
00Oct 29, 2001——
00Nov 5, 1997Oct 22, 1997Yes
00Oct 31, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42732999, documented in the API reference.