TEXAS · WELLS · STARR COUNTY · API 42-427-33410 · DISTRICT 04
Samano #25
Starr County · Samano (2ND Rincon) field · Producing · Vertical
Samano #25 (API 42-427-33410) is a well in Starr County operated by Petrovybe Opco LLC, completed November 28, 2001 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued September 24, 2001, permitted to 8,640 ft.
It was permitted by El Paso Production Oil & Gas CO. and has since transferred to Petrovybe Opco LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Massive 7200, 3rd Massive, 4th Massive.
Its 4 leases have reported 32.7K barrels of oil and 6.42M mcf of gas since November 2001, last reporting volume in April 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by El Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.
- Based in
- Plano, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Dec 29, 2025
- Permits on file
- 6
- Phone
- (214) 810-6207
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petrovybe Opco LLC |
| Production reports | Petrovybe Opco LLCthrough Apr 2026 |
| Latest permit | El Paso Production Oil & Gas Co.Sep 24, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,640
- total depth, ft
- 1
- permits on file
- Sep 24, 2001
- last permit issued
- Nov 28, 2001
- completed
- 32.7K
- cumulative oil, bbl
- 6.42M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2001 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 28, 2001
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Samano G-4-187498 | Samano (2ND Rincon) | Petrovybe Opco LLC | 1 | 32.7K | 6.42M | Nov 2001 – Apr 2026 |
| Samano G-4-188311 | Samano (Fourth Massive) | Petrovybe Opco LLC | 1 | 0 | 0 | Nov 2001 – — |
| Samano G-4-188313 | Samano (Third Massive) | Petrovybe Opco LLC | 1 | 0 | 0 | Nov 2001 – — |
| Samano G-4-188314 | Samano (Massive 7200) | Petrovybe Opco LLC | 1 | 0 | 0 | Nov 2001 – — |
Gas, mcf lease total
Last 12 months 9,868 · prior 12 5,763(+71%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1El Paso Production Oil & Gas Co.Nov 2001 → Jul 2006
- 2El Paso E & P Company, L. P.Aug 2006 → Feb 2008
- 3Smith Production Inc.Mar 2008 → Mar 2011
- 4Legend Natural Gas IV, LPApr 2011 → Feb 2015
- 5Trinity River Energy Oper, LLCMar 2015 → Oct 2017
- 6Wagner Oil CompanyNov 2017 → Jan 2021
- 7Fletcher Operating, LLCMar 2021 → Nov 2025
- 8Petrovybe Opco LLCDec 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 513890-99 | Drill | El Paso Production Oil & Gas Co. | Sep 24, 2001 | Sep 24, 2001 | Oct 28, 2001 | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 28, 2001 | Samano G-4-187498 | Samano (2ND Rincon) | Petrovybe Opco LLC | Producing | 8,640 |
| Nov 26, 2001 | Samano G-4-188314 | Samano (Massive 7200) | Petrovybe Opco LLC | SWR-10-Well · shut in Nov 1, 2001 | 8,640 |
| Nov 24, 2001 | Samano G-4-188313 | Samano (Third Massive) | Petrovybe Opco LLC | SWR-10-Well · shut in Nov 1, 2001 | 8,640 |
| Nov 20, 2001 | Samano G-4-188311 | Samano (Fourth Massive) | Petrovybe Opco LLC | SWR-10-Well · shut in Nov 1, 2001 | 8,640 |
Formation tops
As filed on W-2/G-1. Subsea from 357 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive 7200 | 7,182 | -6,825 |
| 3RD Massive | 7,770 | -7,413 |
| 4TH Massive | 7,888 | -7,531 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,896 | 6,974 | Perforated |
| 6,896 | 7,008 | Perforated |
| 7,004 | 7,008 | Perforated |
| 7,182 | 7,197 | Perforated |
| 7,197 | 7,317 | Perforated |
| 7,257 | 7,300 | Perforated |
| 7,317 | 7,355 | Perforated |
| 7,770 | 7,844 | Perforated |
| 7,888 | 8,190 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,516 | 14.75 | 875 S |
| 7.625 | 6,797 | 9.875 | 485 S |
| 4.5 | 8,638 | 6.75 | 455 S |
| 4.5 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 17, 2002 | Mar 25, 2002 | — |
| 00 | May 6, 2002 | Feb 20, 2002 | Yes |
| 00 | May 2, 2002 | — | — |
| 00 | Mar 13, 2002 | — | — |
Well logs
The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.
Open the RRC's log search for this well ↗The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-33410 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-33410 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42733410, documented in the API reference.