WELL · 42-427-33453 · DISTRICT 4

Coates #1

N

Starr County · Samano (Fourth Massive) field  · Vertical

Coates #1 (API 42-427-33453) is a permitted well in Starr County filed by El Paso Production Oil & Gas CO.; no completion report is on file yet.

The RRC has issued one drilling permit, issued February 12, 2002, permitted to 12,000 ft.

Operator of record

EL Paso Production Oil & Gas Co.

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 30, 2016
Permits on file
616
Phone
(713) 420-2600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Paso Production Oil & Gas Co.
Production reportsPetrovybe Opco LLCthrough Apr 2026
Latest permitEL Paso Production Oil & Gas Co.Feb 12, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
1
permits on file
Feb 12, 2002
last permit issued
—
completed
0
cumulative oil, bbl
6.08M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Coates SS G-4-189890Samano, E. (Fourth Massive)Petrovybe Opco LLC106.08MMar 2002 – Jul 2026
Coates SS G-4-190138Samano, E. (Third Massive)Petrovybe Opco LLC100Apr 2002 – Jul 2026
Coates SS G-4-190139Samano, E. (Massive 7200)Petrovybe Opco LLC100Apr 2002 – Jul 2026
Coates G-4-189810Samano (Fourth Massive)EL Paso Production Oil & Gas Co.100Mar 2002 – Jun 2002

Gas, mcf lease total

Last 12 months 1,073 · prior 12 1,265(-15%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Paso Production Oil & Gas Co.Apr 2002 → Jul 2006
  2. 2EL Paso E & P Company, L. P.Aug 2006 → Feb 2008
  3. 3Smith Production Inc.Mar 2008 → Mar 2011
  4. 4Legend Natural Gas IV, LPApr 2011 → Feb 2015
  5. 5Trinity River Energy Oper, LLCMar 2015 → Oct 2017
  6. 6Wagner Oil CompanyNov 2017 → Jan 2021
  7. 7Fletcher Operating, LLCFeb 2021 → Nov 2025
  8. 8Petrovybe Opco LLCFeb 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
517539-99DrillEL Paso Production Oil & Gas Co.Feb 12, 2002Feb 12, 2002Feb 17, 200212,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-189810————
—— G-4-189890————
—— G-4-190138————
—— G-4-190139————

Perforations

Perforated and open-hole intervals.

FromToType
8,1348,146Perforated
8,1828,198Perforated
8,4808,586Perforated
8,4808,588Perforated
8,9609,056Perforated
8,9609,152Perforated
9,1129,152Perforated
9,2789,296Perforated
9,3309,340Perforated
9,3559,374Perforated
9,3889,414Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,01914.751,106 S
7.6257,3719.875565 S
4.510,5006.75475 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 6, 2003Sep 3, 2003—
00Oct 15, 2002Jul 15, 2002Yes
00Aug 30, 2002——
00Aug 13, 2002——
00Aug 8, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.