WELL · 42-427-33542 · DISTRICT 4
Pena Emma #1
Starr County · Alvarado (Vicksburg) field · Vertical
Pena Emma #1 (API 42-427-33542) is a plugged well in Starr County, plugged August 3, 2006, last operated by Comstock Oil & Gas LP.
The RRC has issued one drilling permit, issued October 14, 2002, permitted to 10,000 ft.
It was permitted by Comstock Oil & Gas, Inc. and has since transferred to Comstock Oil & Gas LP on the wellbore schedule.
Completion filings report one formation top, including Vicksburg.
Operator of record
Permitted by Comstock Oil & Gas, Inc.; the EWA schedule now lists a different operator.
- Based in
- Frisco, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Oct 10, 2019
- Permits on file
- 799
- Phone
- (972) 668-8828
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Comstock Oil & Gas LP |
| Production reports | Comstock Oil & Gas, LPthrough Jul 2006 |
| Latest permit | Comstock Oil & Gas, Inc.Oct 14, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 1
- permits on file
- Oct 14, 2002
- last permit issued
- Oct 4, 2003
- completed
- 0
- cumulative oil, bbl
- 118K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2003 THROUGH Aug 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 4, 2003
- Shut in
- —
- Plugged
- Aug 3, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pena, Emma G-4-194074 | Alvarado (Vicksburg) | Comstock Oil & Gas, LP | 1 | 0 | 118K | Jan 2003 – Aug 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Comstock Oil & Gas, Inc.Feb 2003 → Oct 2004
- 2Comstock Oil & Gas, LPDec 2004 → Jul 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 524512-99 | Drill | Comstock Oil & Gas, Inc. | Oct 10, 2002 | Oct 14, 2002 | Nov 19, 2002 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-194074 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 276 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,226 | 9,238 | Perforated |
| 9,244 | 9,262 | Perforated |
| 9,274 | 9,281 | Perforated |
| 9,292 | 9,308 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,513 | 14.75 | 1,250 S |
| 7.625 | 8,496 | 9.875 | 655 S |
| 4.5 | 9,587 | 6.5 | 295 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 19, 2003 | Oct 27, 2003 | — |
| 00 | May 13, 2003 | Apr 10, 2003 | Yes |
| 00 | May 1, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-33542 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-33542 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42733542, documented in the API reference.