WELL · 42-427-33629 · DISTRICT 4

Richmond #5

Y

Starr County · Samano E. (Massive 7200) field · SWR-10-Well  · Vertical

Richmond #5 (API 42-427-33629) is a well in Starr County operated by Petrovybe Opco LLC, completed August 17, 2003 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit, issued July 14, 2003, permitted to 13,000 ft.

It was permitted by El Paso Production Oil & Gas CO. and has since transferred to Petrovybe Opco LLC on the wellbore schedule.

Completion filings report one formation top, including Vicksburg.

No lease production has been reported under this well’s leases.

Operator of record

Petrovybe Opco LLC

Permitted by EL Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.

Based in
Plano, TX
P-5 status
Active – Extension (X)
P-5 last filed
Dec 29, 2025
Permits on file
6
Phone
(214) 810-6207

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetrovybe Opco LLC
Production reportsWagner Oil Companythrough Jan 2021
Latest permitEL Paso Production Oil & Gas Co.Jul 14, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
1
permits on file
Jul 14, 2003
last permit issued
Aug 17, 2003
completed
0
cumulative oil, bbl
1.31M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 17, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Richmond G-4-196976Samano (1ST Massive)Petrovybe Opco LLC101.31MAug 2003 – Jul 2026
Richmond G-4-196977Samano, E. (Massive 7200)Petrovybe Opco LLC100Aug 2003 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Paso Production Oil & Gas Co.Aug 2003 → Jul 2006
  2. 2EL Paso E & P Company, L. P.Aug 2006 → Feb 2008
  3. 3Smith Production Inc.Mar 2008 → Mar 2011
  4. 4Legend Natural Gas IV, LPApr 2011 → Feb 2015
  5. 5Trinity River Energy Oper, LLCMar 2015 → Oct 2017
  6. 6Wagner Oil CompanyNov 2017 → Jan 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
534098-99DrillEL Paso Production Oil & Gas Co.Jul 14, 2003Jul 14, 2003Jul 21, 200313,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-196976————
—— G-4-196977————

Formation tops

As filed on W-2/G-1. Subsea from 343 ft elevation.Download CSV →

FormationMD ftSubsea
Vicksburg8,270-7,927

Perforations

Perforated and open-hole intervals.

FromToType
8,3728,419Perforated
9,2469,434Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,025161,210 S
7.6257,1979.875365 S
4.511,3766.75653 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 5, 2005Feb 8, 2005—
00Oct 22, 2003Sep 11, 2003Yes
00Oct 9, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42733629, documented in the API reference.