TEXAS · WELLS · STEPHENS COUNTY · NALL,P. LEASE · API 42-429-34066 · DISTRICT 6E

Nall P. #6

Plugged

Stephens County · Nall (3500) field  · Vertical

Nall P. #6 (API 42-429-34066) is a plugged well in Stephens County, plugged January 27, 2016, last operated by Richey Ray Management CO. Inc..

The RRC has issued 2 drilling permits between 1982 and 1984, permitted to 3,750 ft.

It was permitted by Wilbrook Exploration, Inc. and has since transferred to Richey Ray Management CO. Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Caddo, Lake Sand, Marble Falls.

Its lease has reported 13.7K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Richey Ray Management Co. Inc.

Permitted by Wilbrook Exploration, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Jan 15, 2026
Permits on file
136
Phone
(817) 246-2455

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRichey Ray Management Co. Inc.
Production reportsRichey, Ray Management Co., Inc.through Dec 1998
Latest permitWilbrook Exploration, Inc.Apr 5, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,750
total depth, ft
2
permits on file
Apr 5, 1984
last permit issued
May 8, 1984
completed
0
cumulative oil, bbl
13.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1994 THROUGH Dec 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 8, 1984
Shut in
—
Plugged
Jan 27, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nall,p. G-8-110727Nall (3500)Richey, Ray Management Co., Inc.1013.7KJan 1993 – Dec 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Neeley, JuneAug 1994 → Aug 1995
  2. 2Richey, Ray Management Co., Inc.Oct 1998 → Dec 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
234687-99DrillWilbrook Exploration, Inc.Apr 5, 1984Apr 5, 1984Apr 20, 19843,750
180640-99DrillWilbrook Exploration, Inc.Dec 20, 1982Dec 20, 1982—3,750

Completions

CompletedLeaseFieldOperatorStatusDepth
May 8, 1984Nall P. G-8-110727Nall (3500)Richey Ray Management Co. Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,194 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo3,062-1,868
Lake Sand3,350-2,156
Marble Falls3,508-2,314

Perforations

Perforated and open-hole intervals.

FromToType
3,5103,516Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517412.25110 sx
4.53,5887.875135 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 13, 1984May 24, 1984—
00Jun 8, 1984May 24, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42934066, documented in the API reference.