TEXAS · WELLS · STEPHENS COUNTY · API 42-429-34327 · DISTRICT 6E
Nall P. #10
Stephens County · Nall (3500) field · Vertical
Nall P. #10 (API 42-429-34327) is a plugged well in Stephens County, plugged August 3, 1998, last operated by Smith Pipe Of Abilene.
The RRC has issued 2 drilling permits between 1983 and 1984, permitted to 3,750 ft.
It was permitted by Wilbrook Exploration, Inc. and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.
Operator of record
Permitted by Wilbrook Exploration, Inc.; the EWA schedule now lists a different operator.
- Based in
- Abilene, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 29, 2014
- Phone
- (325) 692-3903
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Neeley, Junethrough Apr 1995 |
| Latest permit | Wilbrook Exploration, Inc.Dec 12, 1984 |
- 3,750
- total depth, ft
- 2
- permits on file
- Dec 12, 1984
- last permit issued
- Oct 1, 1993
- completed
- 0
- cumulative oil, bbl
- 10.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 1, 1993
- Shut in
- —
- Plugged
- Aug 3, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nall, P. O-8-21724 | Nall (3500) | Smith Pipe of Abilene | 2 | 0 | 3.24K | Jan 1993 – Sep 1998 |
| Nall, P. G-8-147748 | Nall (3500) | Smith Pipe of Abilene | 1 | 0 | 7.37K | Dec 1993 – Aug 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Greenhaw, Morris R.Dec 1993 → Jun 1994
- 2Neeley, JuneJul 1994 → Apr 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 261018-99 | Drill | Wilbrook Exploration, Inc. | Dec 12, 1984 | Dec 12, 1984 | Dec 1, 1984 | 3,750 |
| 214146-99 | Drill | Wilbrook Exploration, Inc. | Sep 19, 1983 | Sep 23, 1983 | — | 3,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 1, 1993 | Nall P. G-8-147748 | Nall (3500) | Smith Pipe of Abilene | Plugged | — |
| — | Nall P. O-8-21724 | Nall (3500) | Smith Pipe of Abilene | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,479 | 3,485 | Perforated |
| 3,524 | 3,536 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 169 | 12.25 | 110 S |
| 4.5 | 3,750 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 25, 1994 | Jan 3, 1994 | — |
| 00 | Jan 28, 1994 | — | — |
| 00 | Jun 17, 1993 | Apr 16, 1993 | Yes |
| 00 | May 25, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-34327 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-34327 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42934327, documented in the API reference.