WELL · 42-429-34842 · DISTRICT 7

Binney II #2

Y

Stephens County · Stephens County Regular field · Producing  · Vertical

Binney II #2 (API 42-429-34842) is a permitted well in Stephens County filed by Crutcher, David F.; no completion report is on file yet.

The RRC has issued one drilling permit, issued March 31, 1987, permitted to 1,838 ft.

It was permitted by Crutcher, David F. and has since transferred to Caraway Robert R. on the wellbore schedule.

Completion filings report one formation top, including Strawn.

Its 2 leases have reported 16.5K barrels of oil and 160K mcf of gas since January 1993, last reporting in July 2026. The leases carry 11 wells, so these are lease totals, not this well alone.

Operator of record

Caraway Robert R.

Permitted by Crutcher, David F.; the EWA schedule now lists a different operator.

Based in
Cisco, TX
P-5 status
Active (A)
P-5 last filed
Apr 9, 2026
Permits on file
1
Phone
(254) 631-6018

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCumming Company Inc. The
Production reportsCaraway, Robert R.through Apr 2026
Latest permitCrutcher, David F.Mar 31, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,838
total depth, ft
1
permits on file
Mar 31, 1987
last permit issued
—
completed
16.5K
cumulative oil, bbl
160K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
—
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Binney II O-8-26453Stephens County RegularCaraway, Robert R.1116.5K160KJan 1993 – Jul 2026
— G-8-125295——000—

Oil, barrels lease total

Last 12 months 24 · prior 12 24(+0%)

0123202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cumming Company, Inc. TheJan 1993 → Aug 1993
  2. 2Bendorf Services & Supply CoSep 1993 → Dec 2000
  3. 3Marjac Oil Company, Inc.Jan 2001 → Mar 2014
  4. 4Caraway, Robert R.Apr 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
326808-99DrillCrutcher, David F.Feb 19, 1987Mar 31, 1987—1,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—Binney II O-8-26453Stephens County RegularCaraway Robert R.Producing1,838
Aug 31, 1987Binney B G-8-125295Stephens County Regular (Gas)Cumming Company Inc. TheNot on Schedule—
Apr 15, 1987Binney B O-8-24331Stephens County RegularCrutcher David F.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,369 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn1,700-331

Perforations

Perforated and open-hole intervals.

FromToType
1,6881,694Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,8307.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 12, 1992Mar 17, 1992—
00Apr 1, 1992——
00Nov 20, 1987Oct 2, 1987—
00Oct 15, 1987——
00Jun 9, 1987May 6, 1987Yes
00May 28, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42934842, documented in the API reference.