TEXAS · WELLS · STEPHENS COUNTY · BLACK GOLD LEASE · API 42-429-34877 · DISTRICT 6E
Black Gold #1
Stephens County · Black Gold (Jerusalem Rock) field · Vertical
Black Gold #1 (API 42-429-34877) is a plugged well in Stephens County, plugged September 16, 2009, last operated by Intertech Oil Company.
The RRC has issued one drilling permit, issued May 19, 1987, permitted to 6,500 ft.
It was permitted by Black Gold Petroleum CO. (A) and has since transferred to Intertech Oil Company on the wellbore schedule.
Completion filings report 3 formation tops, including Marble Falls, Caddo, Granite Wash.
Operator of record
Permitted by Black Gold Petroleum Co. (A); the EWA schedule now lists a different operator.
- Based in
- Burleson, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jun 26, 1996
- Permits on file
- 2
- Phone
- (817) 447-8056
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Intertech Oil Company |
| Production reports | none |
| Latest permit | Black Gold Petroleum Co. (A)May 19, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,500
- total depth, ft
- 1
- permits on file
- May 19, 1987
- last permit issued
- Sep 14, 1987
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 14, 1987
- Shut in
- —
- Plugged
- Sep 16, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Black Gold O-8-24772 | Black Gold (Jerusalem Rock) | Intertech Oil Company | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 330499-99 | Drill | Black Gold Petroleum Co. (A) | May 19, 1987 | May 19, 1987 | — | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 14, 1987 | Black Gold O-8-24772 | Black Gold (Jerusalem Rock) | Intertech Oil Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,561 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Marble Falls | 3,480 | -1,919 |
| Caddo | 3,890 | -2,329 |
| Granite Wash | 5,748 | -4,187 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,184 | 4,190 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 297 | 12.25 | 185 S |
| 4.5 | 5,938 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 14, 1988 | Nov 12, 1987 | Yes |
| 00 | Mar 4, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-34877 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-34877 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42934877, documented in the API reference.