WELL · 42-429-35374 · DISTRICT 7
Compton 20 #1
Stephens County · Eureka (Caddo) field · Vertical
Compton 20 #1 (API 42-429-35374) is a well in Stephens County operated by Mcclymond Inc., completed January 8, 1993.
The RRC has issued one drilling permit, issued November 3, 1992, permitted to 4,600 ft.
Completion filings report 2 formation tops, including Caddo, Duffer.
Its 2 leases have reported 46.7K barrels of oil and 265K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Breckenridge, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 5, 2001
- Permits on file
- 127
- Phone
- (254) 559-5453
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | McClymond Inc. |
| Production reports | Petexthrough Apr 2026 |
| Latest permit | McClymond, Inc.Nov 3, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,600
- total depth, ft
- 1
- permits on file
- Nov 3, 1992
- last permit issued
- Jan 8, 1993
- completed
- 46.7K
- cumulative oil, bbl
- 265K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 8, 1993
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Compton-20 O-8-27658 | Eureka (Caddo) | Petex | 1 | 46.7K | 139K | Aug 1995 – Jul 2026 |
| Compton "20" G-8-143665 | Eureka (Caddo) | McClymond, Inc. | 1 | 0 | 125K | Jan 1993 – Nov 1995 |
Oil, barrels lease total
Last 12 months 199 · prior 12 68(+193%)
Gas, mcf lease total
Last 12 months 91 · prior 12 20(+355%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1McClymond, Inc.Mar 1993 → Jul 2001
- 2McClymond, Ltd.Aug 2001 → Dec 2009
- 3PetexJan 2010 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 405196-99 | Drill | McClymond, Inc. | Oct 26, 1992 | Nov 3, 1992 | Nov 28, 1992 | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-143665 | — | — | — | — |
| — | — O-8-27658 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,264 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,323 | 3,345 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 134 | 12.25 | 90 S |
| 5.5 | 3,962 | 7.875 | 190 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 9, 1995 | — | — |
| 00 | Mar 11, 1993 | Jan 19, 1993 | Yes |
| 00 | Feb 1, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-35374 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-35374 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42935374, documented in the API reference.