WELL · 42-431-30753 · DISTRICT 8

Foster R. W. #A-1

Plugged

Sterling County · Conger (Penn) field  · Vertical

Foster R. W. #A-1 (API 42-431-30753) is a plugged well in Sterling County, plugged June 26, 2009, last operated by Sahara Operating Company.

The RRC has issued one drilling permit, issued January 23, 1979, permitted to 7,800 ft.

It was permitted by Cotton Petroleum Corp. and has since transferred to Sahara Operating Company on the wellbore schedule.

Operator of record

Sahara Operating Company

Permitted by Cotton Petroleum Corp.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 24, 2026
Permits on file
44
Phone
(432) 697-0967

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSahara Operating Company
Production reportsSahara Operating Companythrough Aug 2008
Latest permitCotton Petroleum Corp.Jan 23, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,800
total depth, ft
1
permits on file
Jan 23, 1979
last permit issued
Mar 5, 1979
completed
0
cumulative oil, bbl
135K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 5, 1979
Shut in
—
Plugged
Jun 26, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Foster, R. W. G-10-83137Conger (Penn)Sahara Operating Company10135KJan 1993 – Jun 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Zachry Oil and Gas PropertiesJan 1993 → Jul 2001
  2. 2Quay Valley, Inc.Aug 2001 → Apr 2006
  3. 3Big Star Oil & Gas, LLCMay 2006 → Sep 2007
  4. 4Sahara Operating CompanyMay 2008 → Aug 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
41278-99DrillCotton Petroleum Corp.Jan 23, 1979Jan 23, 1979—7,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 5, 1979Foster R. W. G-10-83137Conger (Penn)Sahara Operating CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
6,8066,832Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,900111,015 S
2.3756,665——
4.57,6507.8751,040 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 20, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43130753, documented in the API reference.