TEXAS · WELLS · STERLING COUNTY · API 42-431-31376 · DISTRICT 7B

Wilkinson #1

Plugged

Sterling County · Conger (Penn) field  · Vertical

Wilkinson #1 (API 42-431-31376) is a plugged well in Sterling County, plugged April 22, 1986, last operated by Txo Production Corp..

The RRC has issued one drilling permit, issued September 14, 1983, permitted to 8,900 ft.

Operator of record

TXO Production Corp.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 2, 1990
Permits on file
3,227
Phone
(214) 954-2086

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsnone
Latest permitTXO Production Corp.Sep 14, 1983
8,900
total depth, ft
1
permits on file
Sep 14, 1983
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 22, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
212519-99DrillTXO Production Corp.Sep 14, 1983Sep 14, 1983Oct 10, 19838,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—Wilkinson O-10-30812Conger (Penn)TXO Production Corp.Plugged—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 15, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43131376, documented in the API reference.