WELL · 42-431-31531 · DISTRICT 7

Lively-Knight 74 #2

N

Sterling County · Jameson (Strawn) field  · Vertical

Lively-Knight 74 #2 (API 42-431-31531) is a well in Sterling County operated by Bob Hughes Oil Company LLC, completed December 16, 1984.

The RRC has issued one drilling permit, issued September 18, 1984, permitted to 7,100 ft.

It was permitted by Koch Expl.CO.Div.Of Koch Ind.Inc and has since transferred to Bob Hughes Oil Company LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Coleman Junction, Canyon, Strawn, Jameson (Strawn).

Its 2 leases have reported 10.7K barrels of oil and 147K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Bob Hughes Oil Company LLC

Permitted by Koch Expl.co.div.of Koch Ind.inc; the EWA schedule now lists a different operator.

San Angelo, TX · P-5 Y, filed Jan 4, 2026 · 17 permits on file · (325) 653-0693

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBob Hughes Oil Company LLC
Production reportsBob Hughes Oil Company, LLCthrough Apr 2026
Latest permitKoch Expl.co.div.of Koch Ind.incSep 18, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,100
total depth, ft
1
permits on file
Sep 18, 1984
last permit issued
Dec 16, 1984
completed
10.7K
cumulative oil, bbl
147K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 16, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lively-Knight "74" G-9-290434Jameson (Strawn)Bob Hughes Oil Company, LLC101.83KJan 2021 – Jul 2026
Lively-Knight "74" O-9-11113Jameson (Strawn)Bob Hughes Oil Company, LLC210.7K145KJan 1993 – Sep 2021

Gas, mcf lease total

Last 12 months 268 · prior 12 307(-13%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Koch Exploration CompanyJan 1993 → Mar 1995
  2. 2Virtex Petroleum Company, Inc.Apr 1995 → Jan 2008
  3. 3Virtex Operating Company, Inc.Feb 2008 → Jun 2021
  4. 4Bob Hughes Oil Company, LLCJul 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
251677-99DrillKoch Expl.co.div.of Koch Ind.incSep 4, 1984Sep 18, 1984Nov 1, 19847,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-290434————
—— O-9-11113————

Formation tops

As filed on W-2/G-1. Subsea from 2,238 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction4,319-2,081
Coleman Junction6,517-4,279
CanyonCANYON SAND6,654-4,416
CanyonCANYON SAND6,689-4,451
Strawn6,781-4,543
Jameson (Strawn)6,782-4,544

Perforations

Perforated and open-hole intervals.

FromToType
6,7826,870Perforated
6,7826,870Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62546712.25310 S
4.57,0707.8752,235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 16, 2021Mar 1, 2021—
00Jan 17, 1985Dec 27, 1984—
00Jan 15, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43131531, documented in the API reference.