TEXAS · WELLS · STERLING COUNTY · STEWART LEASE · API 42-431-31818 · DISTRICT 7B

Stewart #201

Shut in

Sterling County · Credo E. (Cisco Up.) field · Temp Abandoned  · Vertical

Stewart #201 (API 42-431-31818) is a well in Sterling County operated by Trigeo Energy LLC, completed January 29, 1987 and listed as temp abandoned on the RRC schedule, shut in August 1, 2024.

The RRC has issued one drilling permit, issued June 5, 1986, permitted to 7,575 ft.

It was permitted by Steller Energy & Investment Corp and has since transferred to Trigeo Energy LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Clear Fork, Wolfcamp, Cisco.

Its lease has reported 133 barrels of oil and 249K mcf of gas since January 1993, last reporting volume in July 2024.

Operator of record

Trigeo Energy LLC

Permitted by Steller Energy & Investment Corp; the EWA schedule now lists a different operator.

Based in
Addison, TX
P-5 status
Delinquent (D)
P-5 last filed
Jun 23, 2023
Phone
(940) 668-1884

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrigeo Energy LLC
Production reportsTrigeo Energy, LLCthrough Jul 2024
Latest permitSteller Energy & Investment CorpJun 5, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,575
total depth, ft
1
permits on file
Jun 5, 1986
last permit issued
Jan 29, 1987
completed
133
cumulative oil, bbl
249K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2024

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 29, 1987
Shut in
Aug 1, 2024
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stewart G-10-123462Credo, E. (Cisco, Up.)Trigeo Energy, LLC1133249KJan 1993 – Jul 2024

Gas, mcf lease total

Last 12 months 0 · prior 12 62(-100%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Steller Energy & Investment CorpJan 1993 → Apr 2016
  2. 2Atoka Operating Permian, LLCMay 2016 → Aug 2023
  3. 3Trigeo Energy, LLCSep 2023 → Jul 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
302865-99DrillSteller Energy & Investment CorpJun 4, 1986Jun 5, 1986—7,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 29, 1987Stewart G-10-123462Credo E. (Cisco Up.)Trigeo Energy LLCTemp Abandoned · shut in Aug 1, 20247,575

Formation tops

As filed on W-2/G-1. Subsea from 2,513 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK4,000-1,487
Wolfcamp4,820-2,307
Cisco7,262-4,749
CiscoCISCO SAND7,376-4,863

Perforations

Perforated and open-hole intervals.

FromToType
7,3777,456Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,14711780 S
4.57,5757.8751,350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 13, 1987Mar 9, 1987Yes
00Mar 12, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43131818, documented in the API reference.