WELL · 42-431-33264 · DISTRICT 7
Horwood 39 #1
Sterling County · Sugg Ranch (Canyon) field · Vertical
Horwood 39 #1 (API 42-431-33264) is a plugged well in Sterling County, plugged July 22, 2013, last operated by Exco/Hgi JV Assets LLC.
The RRC has issued one drilling permit, issued February 9, 2009, permitted to 8,100 ft.
It was permitted by Exco Resources, Inc. and has since transferred to Exco/Hgi JV Assets LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Clear Fork, Wolfcamp, Canyon.
Its lease has reported 2.84K barrels of oil and 5.82K mcf of gas since April 2009, last reporting in February 2014.
Operator of record
Permitted by Exco Resources, Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Oct 13, 2017 · 31 permits on file · (888) 788-3781
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exco/Hgi JV Assets LLC |
| Production reports | Exco/Hgi JV Assets, LLCthrough Apr 2013 |
| Latest permit | Exco Resources, Inc.Feb 9, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,100
- total depth, ft
- 1
- permits on file
- Feb 9, 2009
- last permit issued
- Apr 16, 2009
- completed
- 2.84K
- cumulative oil, bbl
- 5.82K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2009 THROUGH Feb 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 16, 2009
- Shut in
- —
- Plugged
- Jul 22, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Horwood "39" O-9-16918 | Sugg Ranch (Canyon) | Exco/Hgi JV Assets, LLC | 1 | 2.84K | 5.82K | Apr 2009 – Feb 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exco Resources, Inc.Apr 2009 → Jan 2013
- 2Exco/Hgi JV Assets, LLCFeb 2013 → Feb 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 678008-99 | Drill | Exco Resources, Inc. | Jan 29, 2009 | Feb 9, 2009 | Mar 1, 2009 | 8,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-16918 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,528 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Clear ForkCLEARFORK | 3,130 | -602 |
| Wolfcamp | 5,020 | -2,492 |
| Canyon | 7,080 | -4,552 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,146 | 7,158 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,063 | 11 | 475 S |
| 4.5 | 7,279 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 29, 2009 | May 15, 2009 | Yes |
| 00 | Jun 13, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-431-33264 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-431-33264 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43133264, documented in the API reference.