WELL · 42-433-01731 · DISTRICT 7
Mc Millin I. S. a/C 5 #1
Stonewall County · Guest (Tannehill) field · Vertical
MC Millin I. S. A/C 5 #1 (API 42-433-01731) is a plugged well in Stonewall County, plugged October 31, 2011, last operated by Texas Pacific Oil Company Inc..
The RRC has issued one drilling permit, issued January 8, 1985, permitted to 6,500 ft.
It was permitted by Sun Expl. & Prod. CO.-Abilene and has since transferred to Texas Pacific Oil Company Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Tannehill, Cisco, Canyon, Caddo.
Operator of record
Texas Pacific Oil Company Inc.
Permitted by Sun Expl. & Prod. Co.-Abilene; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Sep 15, 1982 · 589 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texas Pacific Oil Company Inc. |
| Production reports | none |
| Latest permit | Sun Expl. & Prod. Co.-AbileneJan 8, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,500
- total depth, ft
- 1
- permits on file
- Jan 8, 1985
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Oct 31, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McMillin, I.S. Ac. 5 O-8-21997 | Guest (Tannehill) | Crown Petroleum Corp. | 1 | 0 | 0 | Jan 1993 – Feb 2012 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 263472-99 | Recompletion | Sun Expl. & Prod. Co.-Abilene | Jan 8, 1985 | Jan 8, 1985 | — | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-21997 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,781 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 2,983 | -1,202 |
| CiscoCISCO LM | 3,166 | -1,385 |
| CanyonCANYON SD | 4,534 | -2,753 |
| Caddo | 5,803 | -4,022 |
| Mississippian | 6,072 | -4,291 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,983 | 2,989 | Perforated |
| 2,991 | 2,997 | Perforated |
| 4,535 | 4,557 | Perforated |
| — | 2,989 | Perforated |
| — | 2,997 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 234 | 12.25 | 200 S |
| 5.5 | 4,662 | 7.875 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 7, 1985 | Jan 9, 1985 | — |
| 00 | Feb 1, 1985 | — | — |
| 00 | Jan 12, 1984 | May 8, 1973 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-01731 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-01731 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 3.71K
- bbl, all reported
- Apr 1985
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000007485 | UIC Permit | Plugged Nov 21, 2011 | 700 | 2,000 | 4,552–4,582 |
MONTHLY INJECTED, BBL · H-10 · LAST 9 REPORTED MONTHS
Last 12 months 3,707
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43301731, documented in the API reference.