WELL · 42-433-10490 · DISTRICT 7

Smith Lee et AL #6

Plugged

Stonewall County · Guest (Canyon Sand) field  · Vertical

Smith Lee ET AL #6 (API 42-433-10490) is a plugged well in Stonewall County, plugged June 28, 2023, last operated by Tacor Resources Inc.

The RRC has issued one drilling permit, issued September 18, 2002, permitted to 5,000 ft.

Completion filings report one formation top, including Canyon.

Its 2 leases have reported 644K barrels of oil and 639K mcf of gas since January 1993, last reporting in July 2026. The leases carry 21 wells, so these are lease totals, not this well alone.

Operator of record

Tacor Resources Inc

Midland, TX · P-5 Y, filed Nov 4, 2025 · 29 permits on file · (432) 631-8074

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTacor Resources Inc
Production reportsTacor Resources Incthrough Apr 2026
Latest permitTacor Resources IncSep 18, 2002
5,000
total depth, ft
1
permits on file
Sep 18, 2002
last permit issued
—
completed
644K
cumulative oil, bbl
639K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 28, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 21 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, Lee, Etal O-8-8987Guest (Canyon Sand)Tacor Resources Inc20644K639KJan 1993 – Jul 2026
Smith, Lee et AL O-8-29188Guest (Canyon Sand)Tacor Resources Inc100Nov 2002 – Feb 2003

Oil, barrels lease total

Last 12 months 13,127 · prior 12 13,388(-2%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 5,202 · prior 12 4,645(+12%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Southwest Royalties, Inc.Jan 1993 → Feb 1999
  2. 2Tacor Resources IncMar 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
523648-99DrillTacor Resources IncSep 12, 2002Sep 18, 2002Oct 17, 20025,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-8987————
—— O-8-8987————
—— O-8-29188————

Formation tops

As filed on W-2/G-1. Subsea from 1,808 ft elevation.Download CSV →

FormationMD ftSubsea
CanyonCANYON SAND4,400-2,592

Perforations

Perforated and open-hole intervals.

FromToType
4,6824,726Perforated
4,7034,725Perforated
4,8024,960Perforated
4,9214,941Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625167——
8.62517612.25100 S
4.54,8027.875450 S
4.54,818——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 29, 2013Nov 26, 2012—
00Mar 20, 2003Dec 23, 2002Yes
00Feb 26, 2003——
00Feb 13, 2003——
00Oct 27, 1987Oct 12, 1987—
00Jan 12, 1984Dec 2, 1966—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

55.4K
bbl, last 12 reported months
613K
bbl, all reported
Sep 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000007458H-1 InjectionPlugged Apr 24, 19958292,0004,603–4,682
000103132H-1 InjectionPlugged Jul 17, 20231,0002,2504,500–4,960

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 55,388 · prior 12 48,322(+15%)

05K10K20222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43310490, documented in the API reference.