WELL · 42-433-31067 · DISTRICT 7

Jones -G- #5

Y

Stonewall County · Guest (Canyon Sand) field · Injection  · Vertical

Jones -G- #5 (API 42-433-31067) is a well in Stonewall County operated by Grayrock Energy II LLC, completed December 1, 2022 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued July 10, 1980, permitted to 4,900 ft.

It was permitted by Walsh & Watts, Inc. and has since transferred to Grayrock Energy II LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Swastika, Canyon.

Its lease has reported 168K barrels of oil and 140K mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 22.7K barrels injected in the 12 months reported through September 2025.

Operator of record

Grayrock Energy II LLC

Permitted by Walsh & Watts, Inc.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Aug 4, 2025 · (214) 234-9115

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGrayrock Energy II LLC
Production reportsGrayrock Energy II, LLCthrough Apr 2026
Latest permitWalsh & Watts, Inc.Jul 10, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
1
permits on file
Jul 10, 1980
last permit issued
Dec 1, 2022
completed
168K
cumulative oil, bbl
140K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 1, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jones -G- O-8-4315Guest (Canyon Sand)Grayrock Energy II, LLC5168K140KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 2,548 · prior 12 2,547(+0%)

0200400202420252026

Gas, mcf lease total

Last 12 months 1,087 · prior 12 779(+40%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Walsh & Watts, Inc.Jan 1993 → Jan 2010
  2. 2Plantation Operating, LLCFeb 2010 → Nov 2011
  3. 3Merit Energy CompanyDec 2011 → May 2017
  4. 4Rover Petroleum Operating, LLCJun 2017 → Dec 2023
  5. 5Grayrock Energy II, LLCJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
86301-99DrillWalsh & Watts, Inc.Jul 10, 1980Jul 10, 1980Jul 24, 19804,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-4315————

Formation tops

As filed on W-2/G-1. Subsea from 1,798 ft elevation.Download CSV →

FormationMD ftSubsea
Swastika3,680-1,882
CanyonCANYON SAND4,400-2,602
CanyonCANYON SAND4,600-2,802

Perforations

Perforated and open-hole intervals.

FromToType
4,3934,678Perforated
4,4174,578Perforated
4,6514,678Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515312.25185 S
8.62515312.75185 S
24,639——
4.54,7497.875650 S
4.5—7.875950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 10, 2023Jan 3, 2023—
00Oct 18, 2011Sep 12, 2011—
00Jan 12, 1984Nov 21, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

22.7K
bbl, last 12 reported months
297K
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000102228H-1 InjectionActive1,0002,2004,393–4,750

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 22,673 · prior 12 13,905(+63%)

01K2K3K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43331067, documented in the API reference.