WELL · 42-433-31522 · DISTRICT 7

Henkel H. A. Etal #3

Y

Stonewall County · Mengel E. (Canyon Sand) field · Shut IN  · Vertical

Henkel H. A. Etal #3 (API 42-433-31522) is a well in Stonewall County operated by L.C.S. Production Company, completed November 1, 2003 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued October 27, 1982, permitted to 4,700 ft.

It was permitted by Martin Oil CO. and has since transferred to L.C.S. Production Company on the wellbore schedule.

Completion filings report 2 formation tops, including Coleman Junction, Canyon.

Its lease has reported 609K barrels of oil and 181K mcf of gas since January 1993, last reporting in July 2026. The lease carries 24 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

L.C.S. Production Company

Permitted by Martin Oil Co.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed May 4, 2026 · 1,707 permits on file · (325) 691-1085

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleL.C.S. Production Company
Production reportsL.C.S. Production Companythrough Apr 2026
Latest permitMartin Oil Co.Oct 27, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,700
total depth, ft
1
permits on file
Oct 27, 1982
last permit issued
Nov 1, 2003
completed
609K
cumulative oil, bbl
181K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 1, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 24 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henkel, H. A., Etal O-8-8463Mengel, E. (Canyon Sand)L.C.S. Production Company24609K181KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,922 · prior 12 2,592(-26%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Brooks, E. B., Jr.Jan 1993 → Mar 2000
  2. 2Crown Petroleum Corp.Apr 2000 → May 2007
  3. 3Foundation Energy Management LLCJun 2007 → Nov 2022
  4. 4L.C.S. Production CompanyDec 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
175629-99DrillMartin Oil Co.Oct 27, 1982Oct 27, 1982Oct 20, 19824,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-8463————

Formation tops

As filed on W-2/G-1. Subsea from 1,759 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction1,400359
CanyonCANYON SAND4,252-2,493

Perforations

Perforated and open-hole intervals.

FromToType
4,3154,340Perforated
4,3184,326Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521112.25175 S
2.3754,300——
5.54,6337.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 15, 2024May 6, 2024—
00Sep 5, 2018Jun 18, 2018—
00Jul 11, 2005Dec 30, 2004—
00Jan 12, 1984Dec 29, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
250K
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093480H-1 InjectionActive1002,1504,315–4,340

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43331522, documented in the API reference.