WELL · 42-433-31670 · DISTRICT 7

Pittcock B #9

N

Stonewall County · Geneview (Tannehill) field  · Vertical

Pittcock B #9 (API 42-433-31670) is a well in Stonewall County operated by Coalinga Corporation, completed January 9, 1984.

The RRC has issued one drilling permit, issued August 9, 1983, permitted to 3,100 ft.

It was permitted by Remuda Operating Company and has since transferred to Coalinga Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including Noodle Creek, Tannehill, Stockwether.

Its 2 leases have reported 313K barrels of oil and 37 mcf of gas since January 1993, last reporting in July 2026. The leases carry 29 wells, so these are lease totals, not this well alone.

Operator of record

Coalinga Corporation

Permitted by Remuda Operating Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Feb 2, 1998
Permits on file
68
Phone
(713) 652-0813

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCoalinga Corporation
Production reportsPermex Petroleum Corporationthrough Sep 2019
Latest permitRemuda Operating CompanyAug 9, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,100
total depth, ft
1
permits on file
Aug 9, 1983
last permit issued
Jan 9, 1984
completed
313K
cumulative oil, bbl
37
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 9, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 29 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pittcock Tannehill Unit O-8-27907Geneview (Tannehill)Permex Petroleum Corporation21274K0Jul 1996 – Jul 2026
Pittcock "B" O-8-19936Geneview (Tannehill)Coalinga Corporation839.2K37Jan 1993 – Nov 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Remuda Operating CompanyJan 1993 → Sep 1993
  2. 2Anathema, Inc.Oct 1993 → Dec 1994
  3. 3Lomax Operating Company, Inc.Jan 1995 → Feb 1995
  4. 4Coalinga CorporationMar 1995 → Aug 1998
  5. 5Merit Energy CompanySep 1998 → Aug 2000
  6. 6Journey Operating, L.L.C.Sep 2000 → Feb 2006
  7. 7Kinder Morgan Production Co LPMar 2006 → Jun 2006
  8. 8Legacy Reserves Operating LPJul 2006 → Jan 2017
  9. 9Permex Petroleum Limited PrtnerMar 2017 → Jul 2017
  10. 10Permex Petroleum CorporationAug 2017 → Sep 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
204953-99DrillRemuda Operating CompanyAug 9, 1983Aug 9, 1983—3,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-19936————
—— O-8-27907————

Formation tops

As filed on W-2/G-1. Subsea from 1,690 ft elevation.Download CSV →

FormationMD ftSubsea
Noodle Creek2,808-1,118
Tannehill2,882-1,192
Stockwether2,913-1,223

Perforations

Perforated and open-hole intervals.

FromToType
2,8822,887Perforated
2,8992,906Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515212.25255 S
4.52,9817.875375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 23, 1996Feb 1, 1984—
00Mar 23, 1984Feb 1, 1984—
00Mar 10, 1984Feb 1, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43331670, documented in the API reference.