WELL · 42-433-31863 · DISTRICT 7
Bristow Estate #1X
Stonewall County · Old Glory E. (Strawn) field · Vertical
Bristow Estate #1X (API 42-433-31863) is a plugged well in Stonewall County, plugged April 13, 2010, last operated by Tkp Petroleum Inc..
The RRC has issued one drilling permit, issued July 27, 1984, permitted to 5,200 ft.
It was permitted by Calhoun & Ellison Oil CO. and has since transferred to Tkp Petroleum Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Canyon, Strawn.
Its lease has reported 2.36K barrels of oil and 30 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Calhoun & Ellison Oil Co.; the EWA schedule now lists a different operator.
Lubbock, TX · P-5 Y, filed May 29, 2025 · 106 permits on file · (806) 543-0667
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TKP Petroleum Inc. |
| Production reports | TKP Petroleum, Inc.through May 1996 |
| Latest permit | Calhoun & Ellison Oil Co.Jul 27, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,200
- total depth, ft
- 1
- permits on file
- Jul 27, 1984
- last permit issued
- Sep 5, 1984
- completed
- 2.36K
- cumulative oil, bbl
- 30
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 5, 1984
- Shut in
- —
- Plugged
- Apr 13, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bristow Estate O-8-21642 | Old Glory, E. (Strawn) | TKP Petroleum, Inc. | 1 | 2.36K | 30 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Calhoun & Ellison Oil Co.Jan 1993 → Dec 1994
- 2Escoba Royalty CorporationJan 1995 → Jun 1995
- 3TKP Petroleum, Inc.Jul 1995 → May 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 246559-99 | Drill | Calhoun & Ellison Oil Co. | Jul 27, 1984 | Jul 27, 1984 | — | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-21642 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,571 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,983 | 5,006 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 128 | 12.25 | 140 sx |
| 5.5 | 4,983 | 7.875 | 460 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 5, 1984 | Sep 18, 1984 | — |
| 00 | Oct 2, 1984 | Sep 18, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-31863 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-31863 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43331863, documented in the API reference.