WELL · 42-433-31892 · DISTRICT 7
Metcalf #1
Stonewall County · E.W.D. (Canyon field · Vertical
Metcalf #1 (API 42-433-31892) is a plugged well in Stonewall County, plugged September 22, 2014, last operated by H&G Petroleum Corporation.
The RRC has issued one drilling permit, issued September 18, 1984, permitted to 6,000 ft.
It was permitted by Sinclair Exploration Company and has since transferred to H&G Petroleum Corporation on the wellbore schedule.
Completion filings report one formation top, including Canyon.
Its lease has reported 17.3K barrels of oil and 20 mcf of gas since January 1993, last reporting in February 2015.
Operator of record
Permitted by Sinclair Exploration Company; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Feb 4, 2026 · 6 permits on file · (432) 553-4494
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | H&G Petroleum Corporation |
| Production reports | H&G Petroleum Corporationthrough Jun 2012 |
| Latest permit | Sinclair Exploration CompanySep 18, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- Sep 18, 1984
- last permit issued
- Mar 20, 1985
- completed
- 17.3K
- cumulative oil, bbl
- 20
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 20, 1985
- Shut in
- —
- Plugged
- Sep 22, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Metcalf O-8-22299 | E.W.D. (Canyon | H&G Petroleum Corporation | 1 | 17.3K | 20 | Jan 1993 – Feb 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sinclair Exploration CompanyJan 1993 → Nov 1998
- 2Terminal Energy Corp.Dec 1998 → Aug 2001
- 3H&G Petroleum CorporationSep 2001 → Jun 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 251764-99 | Drill | Sinclair Exploration Company | Sep 18, 1984 | Sep 18, 1984 | — | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-22299 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,679 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,612 | 4,622 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 177 | — | 120 S |
| 4.5 | 4,808 | — | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 17, 1985 | Mar 25, 1985 | — |
| 00 | Apr 12, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-31892 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-31892 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43331892, documented in the API reference.