WELL · 42-433-31923 · DISTRICT 7

Henson #4

N

Stonewall County · Pruitt (Tannehill) field  · Vertical

Henson #4 (API 42-433-31923) is a well in Stonewall County operated by Anderson Dorman, completed January 18, 1985.

The RRC has issued one drilling permit, issued November 21, 1984, permitted to 5,900 ft.

Completion filings report 4 formation tops, including Coleman Junction, Noodle Creek, Tannehill, Strawn.

Its 2 leases have reported 698K barrels of oil and 50.9K mcf of gas since January 1993, last reporting in July 2026. The leases carry 38 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 803 barrels injected in the 12 months reported through September 2025.

Operator of record

Anderson Dorman

Based in
Wichita Falls, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 12, 2011
Permits on file
42
Phone
(940) 723-2632

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnderson Dorman
Production reportsQuatro Oil and Gas, Inc.through Apr 2026
Latest permitAnderson, DormanNov 21, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,900
total depth, ft
1
permits on file
Nov 21, 1984
last permit issued
Jan 18, 1985
completed
698K
cumulative oil, bbl
50.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 18, 1985
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 38 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pruitt (Tannehill) Unit O-8-28348Pruitt (Tannehill)Quatro Oil and Gas, Inc.25418K0Dec 1997 – Jul 2026
Henson O-8-21346Pruitt (Tannehill)Anderson, Dorman13279K50.9KJan 1993 – Mar 2008

Oil, barrels lease total

Last 12 months 1,069 · prior 12 465(+130%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anderson, DormanJan 1993 → Dec 2012
  2. 2Anderson, OmaJan 2013 → Sep 2013
  3. 3Clear Fork, IncorporatedOct 2013 → Oct 2016
  4. 4Quatro Oil and Gas, Inc.Nov 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
258492-99DrillAnderson, DormanNov 13, 1984Nov 21, 1984Dec 1, 19845,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-21346————
—— O-8-28348————

Formation tops

As filed on W-2/G-1. Subsea from 1,905 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction2,710-805
Noodle Creek3,220-1,315
TannehillTANNEHILL SD3,274-1,369
StrawnSTRAWN REEF5,455-3,550

Perforations

Perforated and open-hole intervals.

FromToType
3,2743,298Perforated
—3,298Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.7529512.25175 S
8.7529512.75175 S
8.62529512.25175 S
4.53,3537.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 12, 2001Dec 20, 2000—
00Aug 6, 1998Jul 7, 1998—
00Jan 14, 1998Feb 12, 1985—
00Mar 13, 1985Feb 12, 1985—
00Feb 20, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

803
bbl, last 12 reported months
141K
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000087557H-1 InjectionActive6001,6253,250–3,384

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 803 · prior 12 289(+178%)

020040060020242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43331923, documented in the API reference.