TEXAS · WELLS · STONEWALL COUNTY · API 42-433-31974 · DISTRICT 6E

State of Texas Tannehill Unit #4

Y

Stonewall County · Geneview (Tannehill) field · Producing  · Vertical

State Of Texas Tannehill Unit #4 (API 42-433-31974) is a well in Stonewall County operated by Big AL Oil And Gas, completed March 18, 1985 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1983 and 1985, permitted to 2,975 ft.

It was permitted by Anathema, Inc. and has since transferred to Big AL Oil And Gas on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Its 2 leases have reported 222K barrels of oil and 41 mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 27 wells, so these are lease totals, not this well alone.

Operator of record

Big al Oil and Gas

Permitted by Anathema, Inc.; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Active – Extension (X)
P-5 last filed
Feb 12, 2026
Permits on file
2
Phone
(806) 894-1511

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBig al Oil and Gas
Production reportsBig al Oil and Gasthrough Apr 2026
Latest permitAnathema, Inc.Feb 15, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,975
total depth, ft
2
permits on file
Feb 15, 1985
last permit issued
Mar 18, 1985
completed
222K
cumulative oil, bbl
41
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 18, 1985
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 27 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State of Texas Tannehill Unit O-8-27908Geneview (Tannehill)Big al Oil and Gas15178K0Jul 1996 – Apr 2026
State of Texas O-8-19471Geneview (Tannehill)Coalinga Corporation1244.3K41Jan 1993 – Jun 1996

Oil, barrels lease total

Last 12 months 498 · prior 12 1,095(-55%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anathema, Inc.Jan 1993 → Dec 1994
  2. 2Lomax Operating Company, Inc.Jan 1995 → Feb 1995
  3. 3Coalinga CorporationMar 1995 → Aug 1998
  4. 4Merit Energy CompanySep 1998 → Aug 2000
  5. 5Journey Operating, L.L.C.Sep 2000 → Dec 2003
  6. 6Alexander Resources, Inc.Jan 2004 → Jan 2012
  7. 7Waco Petro, LPFeb 2012 → Nov 2012
  8. 8Big al Oil and GasDec 2012 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
266912-99DrillAnathema, Inc.Feb 14, 1985Feb 15, 1985Mar 6, 19853,000
192348-99DrillAnathema, Inc.Apr 25, 1983Apr 25, 1983—3,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 18, 1985State of Texas Tannehill Unit O-8-27908Geneview (Tannehill)Big al Oil and GasProducing2,975
Mar 18, 1985State of Texas O-8-19471Geneview (Tannehill)Coalinga CorporationNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,703 ft elevation.Download CSV →

FormationMD ftSubsea
Tannehill2,975-1,272

Perforations

Perforated and open-hole intervals.

FromToType
2,8932,896Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516111175 S
7.8752,9757.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 23, 1996Mar 22, 1985—
00Apr 3, 1985Mar 22, 1985—
00Apr 2, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43331974, documented in the API reference.