WELL · 42-433-32018 · DISTRICT 7

Young L.C. #2

Plugged

Stonewall County · Gypsum Creek (Strawn Lime) field  · Vertical

Young L.C. #2 (API 42-433-32018) is a plugged well in Stonewall County, plugged June 1, 1988, last operated by Texzona Oil & Gas Inc..

The RRC has issued one drilling permit, issued May 8, 1985, permitted to 5,900 ft.

Operator of record

Texzona Oil & Gas Inc.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 21, 1997
Permits on file
58
Phone
(325) 673-3781

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexzona Oil & Gas Inc.
Production reportsnone
Latest permitTexzona Oil & Gas, Inc.May 8, 1985
5,900
total depth, ft
1
permits on file
May 8, 1985
last permit issued
Oct 1, 1985
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 1, 1985
Shut in
—
Plugged
Jun 1, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
274507-99DrillTexzona Oil & Gas, Inc.Apr 24, 1985May 8, 1985Jun 14, 19855,900

Perforations

Perforated and open-hole intervals.

FromToType
3,6943,704Perforated
3,7303,740Perforated
3,7563,766Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516512.25160 S
4.53,8197.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 6, 1986Jan 27, 1986—
00Feb 1, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

981
bbl, last 12 reported months
981
bbl, all reported
Apr 1986
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000057617W-14 DisposalPlugged Sep 8, 19884005003,049–3,766

MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS

Last 12 months 981

05001K

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43332018, documented in the API reference.