WELL · 42-433-32181 · DISTRICT 7

Pruitt (Tannehill) Unit #2

Plugged

Stonewall County · Pruitt (Tannehill) field  · Vertical

Pruitt (Tannehill) Unit #2 (API 42-433-32181) is a plugged well in Stonewall County, plugged March 5, 2009, last operated by Quatro Oil And Gas Inc..

The RRC has issued one drilling permit, issued July 1, 1986, permitted to 3,500 ft.

It was permitted by Anderson, Dorman and has since transferred to Quatro Oil And Gas Inc. on the wellbore schedule.

Its 2 leases have reported 426K barrels of oil and 6.28K mcf of gas since January 1993, last reporting in July 2026. The leases carry 29 wells, so these are lease totals, not this well alone.

Operator of record

Quatro Oil and Gas Inc.

Permitted by Anderson, Dorman; the EWA schedule now lists a different operator.

Based in
Joshua, TX
P-5 status
Active (A)
P-5 last filed
Nov 12, 2025
Permits on file
136
Phone
(940) 767-4443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleQuatro Oil and Gas Inc.
Production reportsQuatro Oil and Gas, Inc.through Apr 2026
Latest permitAnderson, DormanJul 1, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
Jul 1, 1986
last permit issued
May 20, 1998
completed
426K
cumulative oil, bbl
6.28K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 20, 1998
Shut in
—
Plugged
Mar 5, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 29 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pruitt (Tannehill) Unit O-8-28348Pruitt (Tannehill)Quatro Oil and Gas, Inc.25418K0Dec 1997 – Jul 2026
Henson-East O-8-23757Pruitt (Tannehill)Anderson, Dorman47.44K6.28KJan 1993 – Mar 2008

Oil, barrels lease total

Last 12 months 1,069 · prior 12 465(+130%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anderson, DormanJan 1993 → Dec 2012
  2. 2Anderson, OmaJan 2013 → Sep 2013
  3. 3Clear Fork, IncorporatedOct 2013 → Oct 2016
  4. 4Quatro Oil and Gas, Inc.Nov 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
303734-99DrillAnderson, DormanJun 30, 1986Jul 1, 1986—3,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-23757————
—— O-8-28348————

Perforations

Perforated and open-hole intervals.

FromToType
3,2503,254Perforated
3,2643,273Perforated
3,2643,274Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62524212.25170 S
4.53,3997.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 6, 1998Jun 1, 1998—
00Jan 14, 1998Jul 19, 1993—
00Oct 21, 1993Jul 19, 1993—
00Oct 2, 1986Sep 18, 1986Yes
00Sep 24, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

5.2K
bbl, last 12 reported months
1.05M
bbl, all reported
Sep 2009
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000087560H-1 InjectionPlugged Mar 16, 20096001,6203,248–3,350

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 5,204 · prior 12 78,730(-93%)

05K10K15K20082009

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43332181, documented in the API reference.