TEXAS · WELLS · STONEWALL COUNTY · MITCHELL, JACK LEASE · API 42-433-32253 · DISTRICT 6E
Mitchell Jack #1
Stonewall County · Wildcat field · Vertical
Mitchell Jack #1 (API 42-433-32253) is a plugged well in Stonewall County, plugged November 25, 2014, last operated by Clear Fork Incorporated.
The RRC has issued one drilling permit, issued June 5, 1987, permitted to 3,500 ft.
It was permitted by Stamper Operating CO., Inc. and has since transferred to Clear Fork Incorporated on the wellbore schedule.
Completion filings report 2 formation tops, including Coleman Juntion, Tannehill.
Operator of record
Permitted by Stamper Operating Co., Inc.; the EWA schedule now lists a different operator.
- Based in
- Abilene, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 4, 2026
- Permits on file
- 472
- Phone
- (325) 677-1309
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Clear Fork Incorporated |
| Production reports | none |
| Latest permit | Stamper Operating Co., Inc.Jun 5, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,500
- total depth, ft
- 1
- permits on file
- Jun 5, 1987
- last permit issued
- Feb 10, 1989
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 10, 1989
- Shut in
- —
- Plugged
- Nov 25, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mitchell, Jack O-8-25282 | Wildcat | Clear Fork, Incorporated | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 330973-99 | Drill | Stamper Operating Co., Inc. | Jun 1, 1987 | Jun 5, 1987 | — | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 10, 1989 | Mitchell Jack O-8-25282 | Wildcat | Clear Fork Incorporated | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,238 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Juntion | 2,900 | -1,662 |
| TannehillTANNEHILL SD. | 3,310 | -2,072 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,310 | 3,312 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 160 | 12.25 | 120 S |
| 4.5 | 3,390 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 20, 1989 | Feb 27, 1989 | Yes |
| 00 | Mar 11, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-32253 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-32253 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43332253, documented in the API reference.