TEXAS · WELLS · STONEWALL COUNTY · API 42-433-32352 · DISTRICT 6E
Fast Break (Tannehill Sand) Unit #1
Stonewall County · Fast Break (Upper Tannehill) field · Shut In · Vertical
Fast Break (Tannehill Sand) Unit #1 (API 42-433-32352) is a well in Stonewall County operated by Ridglea Energy I LLC, completed March 22, 1988 and listed as shut in on the RRC schedule, shut in December 1, 2008.
The RRC has issued one drilling permit, issued February 18, 1988, permitted to 3,125 ft.
It was permitted by Polk & Patton, Inc. and has since transferred to Ridglea Energy I LLC on the wellbore schedule.
Completion filings report 2 formation tops, including B/Coleman Junction, B/Dothan.
Its 2 leases have reported 840K barrels of oil and 54.7K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 24 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Polk & Patton, Inc.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jul 13, 2022
- Permits on file
- 4
- Phone
- (832) 698-4901
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ridglea Energy I LLC |
| Production reports | Ridglea Energy I, LLCthrough Feb 2020 |
| Latest permit | Polk & Patton, Inc.Feb 18, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,125
- total depth, ft
- 1
- permits on file
- Feb 18, 1988
- last permit issued
- Mar 22, 1988
- completed
- 840K
- cumulative oil, bbl
- 54.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2020
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 22, 1988
- Shut in
- Dec 1, 2008
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 24 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Fast Break (Tannehill Sand) Unit O-8-26817 | Fast Break (Upper Tannehill) | Ridglea Energy I, LLC | 16 | 836K | 54.7K | Feb 1993 – Feb 2020 |
| Everett O-8-24816 | Fast Break (Upper Tannehill) | Hunt Oil Company | 8 | 3.32K | 1 | Jan 1993 – Jan 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hunt Oil CompanyJan 1993 → May 2000
- 2Sabre Operating, Inc.Jun 2000 → Dec 2005
- 3Wilcox Petroleum Operating LLC.Jan 2006 → Mar 2014
- 4Ridglea Energy, LLCApr 2014 → Dec 2015
- 5Ridglea Energy I, LLCJan 2016 → Feb 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 342838-99 | Drill | Polk & Patton, Inc. | Feb 18, 1988 | Feb 18, 1988 | — | 3,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 22, 1988 | Fast Break (Tannehill Sand) Unit O-8-26817 | Fast Break (Upper Tannehill) | Ridglea Energy I LLC | Shut In · shut in Dec 1, 2008 | 3,125 |
| Mar 22, 1988 | Everett O-8-24816 | Fast Break (Upper Tannehill) | Hunt Oil Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,700 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Coleman Junction | 2,750 | -1,050 |
| B/Dothan | 2,897 | -1,197 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,008 | 3,013 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 168 | 12.25 | 95 S |
| 4.5 | 3,119 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 4, 1993 | Mar 29, 1988 | Yes |
| 00 | May 12, 1988 | Mar 29, 1988 | Yes |
| 00 | May 4, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-32352 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-32352 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.