TEXAS · WELLS · STONEWALL COUNTY · API 42-433-32845 · DISTRICT 6E

Fast Break (Tannehill Sand) Unit #28A

Plugged

Stonewall County · Fast Break (Upper Tannehill) field  · Vertical

Fast Break (Tannehill Sand) Unit #28A (API 42-433-32845) is a plugged well in Stonewall County, plugged April 25, 1993, last operated by Hunt Oil Company.

The RRC has issued one drilling permit, issued April 13, 1993, permitted to 3,150 ft.

It was permitted by Hunt Oil Company and has since transferred to Hunt Oil Company on the wellbore schedule.

Operator of record

Hunt Oil Company

Permitted by Hunt Oil Company; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitHunt Oil CompanyApr 13, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,150
total depth, ft
1
permits on file
Apr 13, 1993
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 25, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
410706-99DrillHunt Oil CompanyApr 13, 1993Apr 13, 1993—3,150

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Apr 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000078808H-1 InjectionNot activated5001,4002,900–3,000

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011994

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43332845, documented in the API reference.