WELL · 42-433-32939 · DISTRICT 7
Pink Lady #2
Stonewall County · Tiltin Tom (Canyon Reef) field · Producing · Vertical
Pink Lady #2 (API 42-433-32939) is a well in Stonewall County operated by Midland Oil And Gas Inc., completed January 12, 1995 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued December 7, 1994, permitted to 5,300 ft.
Completion filings report 5 formation tops, including Saddle Creek, Cisco, Gunsite, Swastika.
Its lease has reported 109K barrels of oil and 171K mcf of gas since January 1995, last reporting in July 2026.
Operator of record
Midland, TX · P-5 Y, filed Jun 4, 2026 · 229 permits on file · (432) 661-1580
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Midland Oil and Gas Inc. |
| Production reports | Midland Oil and Gas, Inc.through Apr 2026 |
| Latest permit | Midland Oil and Gas, Inc.Dec 7, 1994 |
- 5,300
- total depth, ft
- 1
- permits on file
- Dec 7, 1994
- last permit issued
- Jan 12, 1995
- completed
- 109K
- cumulative oil, bbl
- 171K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1995 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 12, 1995
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pink Lady O-8-27410 | Tiltin Tom (Canyon Reef) | Midland Oil and Gas, Inc. | 1 | 109K | 171K | Jan 1995 – Jul 2026 |
Oil, barrels lease total
Last 12 months 880 · prior 12 858(+3%)
Gas, mcf lease total
Last 12 months 33 · prior 12 29(+14%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Midland Oil and Gas, Inc.Jan 1995 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 430726-99 | Drill | Midland Oil and Gas, Inc. | Dec 7, 1994 | Dec 7, 1994 | Dec 19, 1994 | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-27410 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,773 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Saddle Creek | 3,150 | -1,377 |
| CiscoBASE CISCO LIME | 3,550 | -1,777 |
| Gunsite | 3,722 | -1,949 |
| Swastika | 3,766 | -1,993 |
| CanyonCANYON SAND | 4,356 | -2,583 |
| CanyonCANYON REEF | 5,075 | -3,302 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,084 | 5,092 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 201 | 11 | 120 S |
| 5.5 | 5,117 | 7.875 | 1,550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 9, 1995 | Jan 17, 1995 | Yes |
| 00 | Jan 25, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-433-32939 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-433-32939 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/43332939, documented in the API reference.